![SOLARFOCUS octoplus Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/solarfocus/octoplus/octoplus_installation-manual_1313809025.webp)
Installation
Installation manual
octo
plus
25
Fig. 5-29
Flue chambers: Mount upper
cover
Attach insulation
1
Turn screwed tabs
2
at the bot-
tom of the cover downwards.
Mount cover with 4 x screws
DIN7985-VZ/M5x10 and washers
DIN9021-5-VZ
3
.
Fig. 5-30
Mount overtemperature reset (but-
ton)
Screw switching unit
1
behind the
cover from the front onto the hex
nut and cover cap
2
.
Connect overtemperature reset
(button) to X20, attach protective
earth conductor to lug on the
power element.
Fig. 5-31
Mount the sensors for over-
temperature reset (button)
Insert sensor into the immersion
sleeve
1
on the upper side of the
boiler.
Connect 3 x tank temperature
sensors, X30/X31/X32,
Содержание octoplus
Страница 40: ...Initial commissioning 40 Installation manual octoplus 8 1 Commissioning log...
Страница 41: ...Initial commissioning Installation manual octoplus 41...
Страница 42: ...Initial commissioning 42 Installation manual octoplus 8 2 Customer service order form...
Страница 45: ...System schematic Installation manual octoplus 45...
Страница 46: ...System schematic 46 Installation manual octoplus...
Страница 47: ...System schematic Installation manual octoplus 47...