8 Initial start-up
8 Initial start-up
i
Initial commissioning of the bioler may only be
performed by qualified personnel
(SOLARFOCUS service technician or
SOLARFOCUS specialist service partner) (=
condition for guarantee, warranty).
Requirements
þ
The boiler is hydraulically connected.
þ
The heating system is filled with water and
has been vented.
þ
The boiler is electrically connected.
Commissioning
►
Connect the boiler to the mains power supply.
►
Carry out the commissioning routine in the boiler
control.
Fill out commissioning report, send
i
After having completed initial commissioning,
the completed commissioning form should be
returned to SOLARFOCUS. If this does not
happen, then for guarantee and warranty
claims of any kind the date of shipment from
the manufacturer to the dealer (according to
the delivery note and invoice) will be used.
Commissioning protocol for biomass heating (see at
the end of these instructions)
DR-0074
Power setting
►
During commissioning, set the correct boiler type
1
, the correct nominal boiler output
2
and the sys-
tem type
3
.
Ä
The power control (control of the induced
draught fan) is based on factory-set para-
meters. No further adjustment work is requi-
red for this.
Basic settings screen
Abb. 2-20
9 Shut-down
Disassembly
–
Switch off the boiler and secure it against being
switched on again.
–
Disconnect the boiler from the power supply.
–
Carry out disassembly in the reverse order of
assembly.
Disposal
–
Observe the regional regulations regarding pro-
fessional/environmentally sound disposal.
–
Recycle recyclable materials.
Installation manual
ecotop-zero, ecotop-light
27