5 Installation
5 Installation
5.1 Transport
Option 1: Transport on pallet, with lift truck
The boiler is delivered factory-assembled on a single-
use wooden pallet.
Option 2: Transport with lifting kit
Lifting Kit
►
Dismantle the 4 x mounting angles of the boi-
ler/pallet.
►
Dismantle the boiler door
►
Mount the lifting kit (optional accessory)
on
the boiler.
►
Lift/move the boiler from the pallet.
5.2 Dismantling the boiler door
►
Pull the tab
1
below the fitting.
Ä
The hinge is released from the fixture.
Abb. 2-6
5.3 Remove the pallets
►
Dismantle the 4 x mounting angles of the boi-
ler/pallet.
►
Lift/move the boiler from the pallet.
i
If necessary, use
carrying aid
(optional acces-
sory)
5.4 Placing the boiler
i
Observe the placement of the boiler, the requi-
red minimum
5.5 Set adjustable feet
►
If necessary, adjust the adjustable feet
on the
underside of the boiler
.
Abb. 2-7
5.6 Removing the right-hand side panel
►
Loosen 6 screws
1
.
►
Slightly lift the right-hand side part
2
and remove
it from the side.
18
Installation manual
ecotop-zero, ecotop-light