Solarbotics Squid Hunting Скачать руководство пользователя страница 4

Start by assembling the SolarEngine. This clever circuit 
allows solar energy to be harvested and used in low light 
levels - much lower than is usually possible. 
There 

is

 soldering required, so if you are new to the process, 

review the “how-to” link on the right.

transistor

trigger MCP112 (also looks like a transistor)

22 F capacitor (has paper tape on the legs)

μ

0.22F capacitor

diode

circuit board

Install and solder the parts in as shown below. Pay 

particular attention

 to the 

capacitors. They are similar in physical size, but in fact are 

10,000x

 

different 

electrically. 22µF installs near the middle, where 0.22F (220,000µF!) is  at the end.

Intro to soldering

youtu.be/iGzXGtH3adw

1.1

Back side, after soldering

ASSEMBLY STEPS

1. SolarEngine Circuitry

Step

22

μ

F

capacitor
(C2)

2222a
Transistor 
(flat side
facing in)

MCP Trigger
(flat side
facing out, 
in 1381 spot)

Diode (D1)

Polarity stripe

+

-

Front side

0.22F
capacitor
(C1)

1.3

Cut two 6.5cm (2.5”) pieces of wire (one of each color) and remove 3mm (1/8”) of 

insulation from each end. Place your solar panels face down and edge to edge as 
shown. 
We are wiring these in 
parallel (+ to +, - to -), so 
solder the positives of the 
panels together, and the 
negatives of the panels 
together.

MATCH

 the orientation markers on any marked leads. Anything with a stripe is negative (”-”), and are 

installed in the hole nearest that symbol. These components do not work backwards!

SolarEngine 
circuit board

3

Collect your electronics, being: 

Remove any tape from the parts

1.2

Содержание Squid Hunting

Страница 1: ...0425 DocRev Sept 09 2018 Basic soldering tools required 1 2 hours build time Intermediate ages 12 skill level Solar powered no batteries needed The Solar CarouSol Kit Cruisingtheoceanfloor one hunts t...

Страница 2: ...self activating solar powered sculpture Unlike other solar powered devices our TM SolarEngine technology allows us to extract useful energy from light levels otherwise unusable by solar cells In dire...

Страница 3: ...ring Iron Solder 4 x Laser cut wood panels 1 x Rotation point screw 1 x 2 0cm 3 4 counter balance bearing 1 x Spinning surface 1 x Propeller 1 x Motor 2 x SCC3733 solar panel 2 x 30AWG wire 1 x Solar...

Страница 4: ...ntro to soldering youtu be iGzXGtH3adw 1 1 Back side after soldering ASSEMBLY STEPS 1 SolarEngine Circuitry Step 22 F capacitor C2 2222a Transistor flat side facing in MCP Trigger flat side facing out...

Страница 5: ...ight or incandescent light and wait 2 8 minutes with the motor prop free to spin When it activates you should feel it push air away from the motor If not reverse the motor wire connections If you have...

Страница 6: ...of find prepare and assemble The parts are cut so you only have to carefully rock them out of the panel to break them free 2 2 With all two tentacles and 8 arms yup we checked installed your squid sh...

Страница 7: ...een in the middle 3 1 Remove the submarine ring 14 and remove cutouts Mount it to the square pegs at the end of the side portals so it sits tight and snug 3 2 To prepare the first rib for installation...

Страница 8: ...ed the wires of the SolarEngine through the ring assembly You want your wires to exit just ahead of the middle mounting ring Finish with the SolarEngine module sitting in the middle of the ring cavity...

Страница 9: ...nstall easier if you slide the motor fin 17 out just a bit 4 0 4 Assembling the Balance Arm Step ASSEMBLY STEPS 22 21 20 Locate the balance arm 20 2 solar panel holders 21 and connector peg 22 Mount t...

Страница 10: ...ier SolarEngine access Feed the wire through the small holes along the balance arm These wires will be used to connect the solar panels to the SolarEngine in the next step 4 2 Snug the wires tight fro...

Страница 11: ...4 6 Cut four 3mm 1 8 wide strips from the double sided sticky tape Peel the protective paper off and mount the solar panels to the panel holders Hide any extra wire in behind the panels 4 7 With the...

Страница 12: ...bered below starting with 24 The other short frond 27 must go directly across from it 24 25 26 28 29 27 5 2 Locate the tower base 35 and tower cap 36 and remove cutouts Install the kelp frond assembly...

Страница 13: ...t the bearing into the holder slide the catch down to trap it in and hang it up Lift the Squid Hunting up to the ball and the magnet will easily suspend the assembly Select the hanging location carefu...

Страница 14: ...t loosen the rotation point and slide it a bit to the low side to help correct the fore aft balance Is everything installed Missing parts can easily cause a shift in balance Any forgotten cut outs you...

Страница 15: ...egant airship travel cleverly TM powered with SolarEngine Technology Liked Squid Hunting Check out our other dynamic kits The GraviTrack Marble lifting motion feature two arms and an elegant mid ight...

Страница 16: ...ildren Product contains small parts even when assembled that might be a choking hazard for children under five 2018 Solarbotics Ltd All rights reserved Parts quantities features and specifications are...

Отзывы: