![Solar Stik 21-0202317 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/solar-stik/21-0202317/21-0202317_operator-and-maintenance-manual_1313496021.webp)
|
21
April 2022
|
Solar Stik® Inc.
Operator and Maintenance Manual for the 24VDC Li ESM 2000
Connect Inter-Connect Cable to ESM Power Port
Connect the Inter-Connect Cable to ESM. After inserting the plug (
A
) into the socket (
B
) , twist/
tighten the connector collar (
C
) to lock connection. The connection is “keyed” making it impossible
to connect with reverse polarity.
Connect Inter-Connect Cable(s) to Inter-Connect Strip
OPERATOR INSTRUCTIONS
Prior to operating the ESM in an HPS for the first time, charge it fully with a PRO-Verter, Power
Hub, or an other charging source, such as a battery charger, until the battery reaches 100% SOC.
Inter-Connect
Cable
Li ESM 2000
Inter-Connect
Strip 7
Connect the opposite end of the Inter-Connect Cable to the Inter-Connect Strip or, directly to the
power management component if only one (1) or two (2) ESMS are to be used. Lock connection by
twisting the locking wheel.
Inter-Connect Plug
A
B
C
Figure 10. ESM Power Connector
Figure 11. Connecting ESMs to Inter-Connect Strip 7: a battery bank
Содержание 21-0202317
Страница 33: ...33 April 2022 Solar Stik Inc Operator and Maintenance Manual for the 24VDC Li ESM 2000...
Страница 34: ...Operator and Maintenance Manual for the 24VDC Li ESM 2000 April 2022 Solar Stik Inc 34...
Страница 35: ...35 April 2022 Solar Stik Inc Operator and Maintenance Manual for the 24VDC Li ESM 2000...
Страница 36: ...Operator and Maintenance Manual for the 24VDC Li ESM 2000 April 2022 Solar Stik Inc 36...
Страница 37: ...37 April 2022 Solar Stik Inc Operator and Maintenance Manual for the 24VDC Li ESM 2000...