![Solar MD mypower24 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/solar-md/mypower24/mypower24_quick-installation-manual_1313470005.webp)
Solar MD Proprietary Limited
Company Registration: 2014/169938/07
T: 021 555 2181
E:
W:
Figure 6 Top clearance
The top side of the box is clear for drilling
in entire section. Avoid using long drill
bits clearance is 57mm shown in figure 6
4.
Electrical installation
Step 1. Before connecting anything be sure that battery is off and the safety
jumper is removed (figure 7 safety jumper).
Figure 7 BMS board component location