12
PREPARATION
These installation instructions provide all the
information needed for positioning the UPS
(including environmental requirements) and for
connecting the input and output power cables.
Inspection
Upon receiving the UPS, examine the packaging
for any signs of mishandling or damage. If any
damage is noted, call your local Sola/Hevi-Duty
representative and/or notify your carrier.
Environment
NOTE:
Operating in temperatures above 25°C
(77°F) will reduce battery life. The UPS
environment must be free of conductive
contaminants and excessive moisture (water and
condensation), flammable vapors, chemical fumes
or corrosive gases and liquids.
Required Setup
Equipment
The tools below are required to properly set up
your UPS:
• Pallet jack
• 13 mm (1/2") ratchet or wrench
• Torque wrench (in-lb)
• Flathead screwdriver
• #2 Phillips screwdriver
Site Preparation
When deciding where to locate your UPS,
consider the weight and size of the unit. Make sure
that the structural integrity of the floor can
withstand the weight of a fully loaded unit. Refer to
the table below for size and fully populated weight
considerations.
Check to make sure that your UPS will be located
in a well-ventilated area with at least 305 mm
(12 inches) behind it. The UPS is force-cooled with
the aid of internal fans. Cooling air enters from the
front of the UPS and is exhausted through
ventilation grilles in the back. It should also have at
least 915 mm (36 inches) in front in order to
change modules when necessary.
The unit frame is bolted to the shipping pallet to
ensure safety. It is recommended that a pallet jack
be used to transport the unit to its operating
location (prior to unbolting the unit).
Max Weight
kg (lb)
H x W x D
mm (in)
536
(1182)
1346 x 508 x 711
(53 x 20 x 28)
915 mm
(36")
305mm
(12")
Содержание S5K
Страница 1: ...S5K Modular UPS USER MANUAL 208 240V 60Hz 12 to 20 kVA...
Страница 2: ......
Страница 7: ...3 Introduction General Description Modes of Operation Major Components...
Страница 14: ...10...
Страница 15: ...11 Installation Preparation Unloading Cable Installation Communications...
Страница 23: ...19 Operating Instructions Controls and Indicators Operating Procedures Main Menu...
Страница 39: ...35 Troubleshooting Alarm Messages Module LED Indication Module Replacement...
Страница 46: ...42...
Страница 47: ...43 Maintenance Proper Care Scheduled Maintenance Replacing Fan Filters...
Страница 49: ...45 Reference Specifications Battery Run Times Warranty...
Страница 54: ...50...
Страница 55: ......