
8.2 End test 2
When the electronic card is switched on after the end test 1, end test 2 starts.
-
4
” of pause
-
Heating to reach 65°C with 15’ of time out
-
Drain + Regeneration valve on 30”
-
Memorize end test is finished.
During this phase, failure routine of unsuccessful heating and failure routine of ntc works. If the water temperature doesn’t
increase,
at the end of 15’, the drain pump will be on.
8.3 End test 3
After the “End test 2”
When dishwasher energized, all characters and backlight will be activated for production line control.
Screen will stay in this condition until energy becomes off.
When Power OFF and ON again the machine, machine will be in ready position to start to program (in washing mode) (as a
default first program 1P will be ON in the screen).
During END test3, in addition to above condition; if user press any button, the machine will be in ready position to start to
program ( like point 3.1 selecting and starting at power on and as a default program 1P will be ON in screen).
60
Содержание T41 - LCD 1
Страница 1: ...SERIES T41 T42 T43 1...
Страница 37: ...37...
Страница 40: ...40...
Страница 77: ...77...