Test Procedure
27
© 2019 Softing Singapore Pte Ltd.
5.4
Unpinned to Unpinned Channel
The following procedure describes steps to test Unpinned to Unpinned channel configuration. There
could be two possible configurations:
Configuration A
Configuration B
Note
Due to the limitations of the connecting hardware for this configuration in the IEC
61280-4 -1’s test procedure, the following procedure is a recommendation by Softing,
following the closest practical approach to the original intention of yielding satisfactory
results in practical situations.
For simplified understanding, the two configurations will be represented using the following diagram:
5.4.1
Test cord insertion loss verification
LC and RC are recommended to be of reference grade.
1.
Connect the LC to the LOCAL and REMOTE units.
2.
Press the
[TOOLS]
button
è
Set Reference
and press the
[Ok]
button to set reference.
Please ensure the fiber cords are cleaned using the cleaning kit provided in the kit.
3.
Disconnect LC from the LOCAL unit.
4.
Do not disconnect LC from the REMOTE unit.
5.
Connect the unpinned end of RC to the LOCAL unit and the pinned end to the unpinned end of LC
using a coupler.
6.
Press the
[AUTOTEST]
button to perform an AUTOTEST.
7.
Check that the result is less than the acceptable loss limits.
Termination 1
Termination 2
Attenuation Requirement
Reference Grade
Reference Grade
≤
0.1dB
Reference Grade
Standard Grade
≤
0.3dB
Standard Grade
Standard Grade
≤
0.5dB
8.
Clean the adaptors and connectors or replace the cords if necessary and repeat the test again.
Unpinned
Unpinned
Содержание WireXpert 4500 Fiber MPO
Страница 1: ......
Страница 33: ...Declarations 33 2019 Softing Singapore Pte Ltd 7 Declarations ...