![Sofar 3000TLM-G2 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/sofar/3000tlm-g2/3000tlm-g2_user-manual_1311942009.webp)
SOFAR 3K~6KTLM-G2
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 4 -
Before any repair work, turn OFF the AC circuit breaker
between the inverter and electrical grid first, then turn OFF the DC
switch.
After turning OFF the AC circuit breaker and DC switch, wait
for 5 minutes at least before carrying out any maintenance or repair
work.
Danger
Inverter should work again after removing any faults. If you
need any repair work, please contact with the local authorized
service center.
Can’t open the internal components of inverter without
authorized. Shenzhen SOFARSOLAR Co., Ltd. does not take any
responsibility for the losses from that.
Attention
EMC / noise level of inverter
Electromagnetic compatibility (EMC) refers to that one electrical equipment
functions in a given electromagnetic environment without any trouble or error, and
impose nonacceptable effect upon the environment. Therefore, EMC represents the
quality characters of an electrical equipment.
The inherent noise-immune character: immunity to internal electrical noise.
External noise immunity: immunity to electromagnetic noise of external system.
Noise emission level: influence of electromagnetic emission upon environment.
Electromagnetic radiation from inverter may be harmful to
health!
Please do not continue to stay around the inverter in less than 20
cm when inverter is working.
Danger
1.2. Symbols and signs
Caution of burn injuries due to hot enclosure!
You can only touch the screen and pressing key of the inverter
while it’s working.
Caution
PV array should be grounded in accordance to the requirements
of the local electrical grid operator!
We suggest that all PV module frames and inverter are reliably
grounded to protect the PV system and personnel security.
Attention