
SOFAR 3K~6KTLM-G2
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 13 -
7
M5Hexagon screws
2pcs
8
Expansion bolts
8pcs
9
M6 flat washer
8pcs
10
Self-tapping screw
5pcs
11
Manual
1pcs
12
The warranty card
1pcs
13
Registration Form
1pcs
14
AC output terminal
1pcs
15
485 terminal (2pin)
1pcs
3.3. Tools
Prepare tools required for installation and electrical connections.
Table 3-2 shows the tools required for installation and electrical connections.