SOFAR 3K~6KTLM-G2
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 48 -
extinguish, then turn on the DC breaker again, then Continue to update from step 5.
Step 9
After the update is completed, turn off the DC breaker, wait for the
LCD screen extinguish, then recover the communication waterproof and then turn
on the DC breaker and AC breaker again, the inverter will enter the running state.
User can check the current software version in Systemlnfo>>3.SoftVersion.