SOFAR 3K~6KTLM-G3
User manual
Copyright © Shenzhen SOFAR SOLAR Co., Ltd
- 14 -
3.3. Tools
Prepare tools required for installation and electrical connections.
Table 3-2 Shows the tools required for installation and electrical connections.
NO.
Tool
Model
Function
1
Hammer drill
Recommend drill
dia. 6mm
Used to drill holes on the wall.
2
Screwdriver
Wiring
3
Cross screwdriver
Remove and install AC terminal
screws
4
Removal tool
Remove PV terminal
5
Wire stripper
Strip wire
6
5mm Allen
Wrench
Turn the screw to connect rear
panel with inverter.
7
Crimping tool
Used to crimp power cables
8
Multi-meter
Used to check grounding
9
Marker
Used to mark signs
10
Measuring tape
Used to measure distances
11
Level
Used to ensure that the rear panel
is properly installed
Содержание 3.6KTLM-G3
Страница 1: ...Shenzhen SOFAR SOLAR Co Ltd Solar Grid tied Inverter Product Model SOFAR 3K 6KTLM G3 User manual ...
Страница 15: ...SOFAR 3K 6KTLM G3 User manual Copyright Shenzhen SOFAR SOLAR Co Ltd 10 2 3 Efficiency curve ...
Страница 33: ...SOFAR 3K 6KTLM G3 User manual Copyright Shenzhen SOFAR SOLAR Co Ltd 28 Figure 4 13 COM interface ...