![Sno-Way 29VSKD SERIES Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/sno-way/29vskd-series/29vskd-series_installation-and-owners-manual_1309149009.webp)
8
Control Wiring Installation
1. Position the control box in cab. Secure the control box
using hook and loop fastener provided.
2. Route the power harness lead to the battery (See
Figure 1-4). Connect the YELLOW wire to the negative (-
) battery terminal and the WHITE wire to the positive (+)
battery terminal.
3. Route the control harness lead around the pivot point
on the loader arms on the back of the Skid Steer and
down the top of the loader arms to the front. Allow
enough slack when routing wire so that wiring is not put
in tension when the loader arms are moved. Position the
wiring to prevent pinching when loader arms pivot, and
secure with cable ties. (See Figure 1-3) and (See Figure
1-4).
Figure 1-3
Figure 1-4
Mechanical Installation
Final Installation
1. Remove the A-frame/tower assembly from the box.
2. Remove power unit.
3. To aid in the pin installation as the blades are
installed, loosen two nuts securing each lower support
plate to the DS and PS wings. (See Figure 1-5)
Figure 1-5
LOADER ARM
PIVOT
CONTROL
HARNESS
LEAD
CONTROL
HARNESS
LEAD
CONTROL
HARNESS
CONTROL
BOX
BATTERY
POWER
HARNESS
LOWER
PLATES
SUPPORT
PLATE NUTS
SUPPORT
INSTALLATION
Содержание 29VSKD SERIES
Страница 14: ...13 WIRING SCHEMATIC ...
Страница 17: ...16 NOTES ...
Страница 18: ...Hartford WI 53027 USA Website www snoway com 2015 Sno Way International SNO WAY INTERNATIONAL INC ...
Страница 19: ...18 ...