background image

 

STEP 8:  ADJUSTMENT: Adjust cable lengths so that 
each spring stretches 3/8” when the clutch lever is 
depressed. When released, both clutch cables should 
be slack. See Figure 8. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FIGURE 8 

 
STEP 9:  LUBRICATION: Remove check plug to 
check grease level in auger gear case. If grease is not 
visible from check plug hole, pump BENELENE 900 
grease, SNAPPER Part No. 2-9577, into fill plug on 
case until grease is visible. Reinstall check plug. See 
Figure 9. 
 

 

 

FIGURE 9 

 
STEP 10: CHECKLIST: Complete all items on the Pre-
Operation Checklist as instructed. 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

SPRING SHOULD 
STRETCH 3/8” 
WHEN HANDLE IS 
DEPRESSED 

CONNECTOR 

TO ADJUST, LOOSEN JAM NUT 
AND TURN CONNECTOR TO 
SHORTEN OR LENGTHEN 
CABLE AS NEEDED TO ATTAIN 
THE 3/8” EXTENSION. TIGHTEN 
JAM NUT AFTER ADJUSTING. 

JAM 
NUT 

GEAR CASE  
GREASE FITTING 

CHECK PLUG 

Содержание Intermediate Frame Snow Throwers

Страница 1: ...ting position Remove shipping cardboard from in between handles See Figure 1 Insert bolts through both upper lower handles and secure with nuts Make sure the square necks of the bolts are recessed into the square holes of upper handles Tighten nuts securely See Figure 2 FIGURE 2 STEP 3 HANDLES Cut both wire ties that secure the control levers to the handles Cut the wire tie that secures the chute ...

Страница 2: ...olt washer and wing nut Tighten securely Use wing nut to securely lock deflector into desired position See Figure 7 FIGURE 7 NOTE After set up the hardware bag will contain two shear bolts and two nuts and a cotter pin IMPORTANT All necessary initial adjustments are made to the machine at the factory The following cable adjustments and lubrication are provided for reference only Complete all items...

Страница 3: ...rom check plug hole pump BENELENE 900 grease SNAPPER Part No 2 9577 into fill plug on case until grease is visible Reinstall check plug See Figure 9 FIGURE 9 STEP 10 CHECKLIST Complete all items on the Pre Operation Checklist as instructed SPRING SHOULD STRETCH 3 8 WHEN HANDLE IS DEPRESSED CONNECTOR TO ADJUST LOOSEN JAM NUT AND TURN CONNECTOR TO SHORTEN OR LENGTHEN CABLE AS NEEDED TO ATTAIN THE 3 ...

Страница 4: ...position _____ ENGINE ELECTRIC STARTER checked for proper operation _____ FUEL SYSTEM checked for leaks around tank and connections ______DISCHARGE CHUTE CRANK checked for proper operation and free rotation ______AUGER and WHEEL DRIVE CONTROL CABLES checked and adjusted per instructions in the Operator s Manual _____ GROUND SPEED CONTROL checked and adjusted per instructions in the Operator s Manu...

Отзывы: