
10
www.snapperpro.com
Installation
Belt Guard Installation
1. Insert two (2) 5/16-18 X 1 bolts (A, Figure 14),
each fitted with one (1) 5/l6 lock washer, up
through the pulley guard holes in the deck.
2. Install the Fast-Vac drive pulley guard onto the
bolts inserted in previous step, secure with two (2)
5/16 nylon nuts. Tighten securely.
3. Install the belt guard (A, Figure 15) between the
pulley guard and the belt guard support clip on the
front part of the blower mount.
4. For convenience, lay the pulley guard cover atop
the belt guard. Secure the belt guard with two (2)
5/16 nylon nuts.
IMPORTANT NOTE: When removing Fast-Vac unit
from mower, install pulley guard cover over opening in
pulley guard to prevent contact with pulley.
Blower Installation
Figure 15. Belt Guard Installation
A. Belt Guard
B. Belt Guard Cover
Figure 14. Pulley Guard Installation
A. 5/16-18 Nylon Nuts
Collector Installation
1. Replace the existing bumper support brackets (A,
Figure 16) with the new bumper support brackets
included with the kit. Use the existing hardware to
secure them into place.
Figure 16. Install Bumper Support Bracket
A. Bumper Support Bracket (RH Side Shown)
A
A
B
A
Содержание FAST-Vac
Страница 23: ......