35
1) Determine edge clip
height
3) Attach clip to the
module
2) Snap the clip to the
correct height
4) Attach screen to clip
Series 100 UL
Edge Screen
Design Tools
- SnapNrack has a suite of design tools
to help configure your PV installation to
be an accurate and fast install. Please
visit us at: www.SnapNrack.com.
Warning
- Always wear fall protection
and safety gear.
Notes
- SnapNrack engineered systems should
only be used with SnapNrack components
and hardware. Any alternate application
may void the warranty and structural
calculations could become invalid.
Step-by-Step Instructions
1) Hold the SnapNrack edge screen
clip upside down up to the edge of the
array to visually see which notch the
clip will need to be broken off at.
2) Using pliers break the Edge screen
clip at the appropriate length.
3) Clip the edge screen clip to the lip on
the underside of the modules around the
area that the edge screen will be installed.
Recommended spacing of
clips is 3' - 0" on center.
4) Attach the screen to the clips on the
installed clips and repeat these steps
continuing around the entire array.
Содержание Series 100 UL
Страница 48: ...48 Notes...