background image

20K 2-Post Lift 

Installation, Operation and Maintenance 

 

Page 17 

 

Rev. 11/10/2021

 

 

 

EAZ0080V85A 

M

AINTENANCE

 

To  avoid  personal  injury,  permit  only  qualified 
personnel to perform maintenance on this equipment.  
Maintenance  personnel  should  follow  lockout/tagout 
instructions per ANSI Z244.1.   
The  following  maintenance  points  are  suggested  as 
the  basis  of  a  routine  maintenance  program.    The 
actual maintenance program should be tailored to the 
installation  and  include  a  record  of  each  planned 
maintenance  activity  and  repair  maintenance  activity 
performed.  Refer  to  the  maintenance  section  of  the 
ANSI/ALI ALOIM booklet (blue book) provided with the 
lift.  

  If lift stops short of full rise or chatters, check fluid 

level  and  bleed  both  cylinders  per  Installation 
Instructions. 

  Replace  all  Safety,  Warning  or  Caution  Labels  if 

missing or damaged (

See Installation instructions 

page 3

.

Daily 

  Keep lift components clean. 

  Check for loose or broken parts. 

  Check hydraulic system for fluid leaks. 

  Check  adapters  for  damage  or  excessive  wear. 

Replace  as  required  with  genuine  Snap-on 
Equipment parts. 

  Check  lock  release  activation.  Each  Column  Lock 

should  move  freely.  When  the  Air  Cylinder  is  fully 
extended,  the  Column  Lock  should  rest  firmly 
against the back of the column. 

Weekly 

  Check  synchronizer  cables  and  sheaves  for  wear. 

Replace  as  required  with  genuine  Snap-on 
Equipment parts. 

  Check  synchronizer  cable  tension  per  Installation 

Instructions.  Adjust  if  necessary.  If  both  threaded 
ends of either cable have run out of adjustment, then 
replace  both  cables.  (Cables  should  always  be 
replaced in sets.) 

Monthly 

  Torque concrete anchor bolts to 80 ft-lbs. 

  Visually  inspect  concrete  floor  for  cracks  and/or 

spalling within 12” of base plate 

  Check  overhead  shutoff  switch.  While  raising  lift, 

operate  overhead  shutoff  bar.  Power  Unit  motor 
should stop when bar is raised. 

  Lubricate  carriage  slide  tracks  with  heavy  viscous 

grease. (Grease all (4) corners of both columns.) 

If  any  problems  are  encountered,  contact  your 
local service representative

 

Содержание EELS542A

Страница 1: ...enance Manual 20K Two Post Surface Mounted Lift MODELS EELS542A EELS543A EELS745A EELS746A 20 000 LBS CAPACITY 5000 LBS PER ARM Snap on Equipment 309 Exchange Avenue Conway AR 72032 TEL 800 225 5786 I...

Страница 2: ...RIVE ON DIRECTION G TO NEAREST OBSTRUCTION OR NEAREST WALL 19 REF 168 14 0 MIN TO NEAREST OBSTRUCTION 168 14 0 MIN TO NEAREST OBSTRUCTION COLUMN BASE PLATES E REAR OF COLUMN FRONT OF COLUMN D D Fig 1c...

Страница 3: ...l injury LOCATION This lift has been evaluated for indoor use only with an operating ambient temp range of 5 40 C 41 104 F Outdoor installation is prohibited ELECTRICAL REQUIREMENTS For lift installat...

Страница 4: ...ION AND SERVICE Refer to ANSI ALI ALIS current edition IMPORTANT Always wear safety glasses while installing lift TOOLS MINIMUM REQUIRED a Tape measure 16ft b Chalk line c 4ft level d 10 adjustable wr...

Страница 5: ...ight Install the cable on the sheave and slide into place Stack the 3 8 spacer onto the sheave assembly Still holding the sheave assembly slide the pin into place Install the bolt to secure the pin se...

Страница 6: ...a time around each column 18 Raise both carriages 400 lbs ea high enough to drill the two inner anchor holes on each column Measure both carriage heights to ensure they are in the same lock position 1...

Страница 7: ...with the 10mm dia x 55mm Lg clevis pin hairpin cotter Fig 8 Overhead Bracket Idler Side SYNCHRONIZER CABLES 29 Remove Cable Trapping Hardware at the top of each column Fig 9 Route free end of cables c...

Страница 8: ...d fitting off one full turn Again tighten flared fitting finger tight then rotate flared fitting 1 1 2 hex flats 90 deg 31 Mount Power Unit to power column as shown in Fig 11 The mounting hardware 4 5...

Страница 9: ...Side Hose up the column to the lowest available hole of the column extension Insert steel tubing end of the Power Unit Hose into the extension outside in and connect to the tee Leave the assembly han...

Страница 10: ...d Width and Height CL16 2 6 Reduced Height without Reduced Width CL16 2 6 or 12 Reduced Width without Reduced Height CL16 2 6 Reduced Height with 6 or 12 Reduced Width CL16 2 12 Reduced Height CL16 0...

Страница 11: ...the air line to the Idler Column using black wire ties through the double holes in the middle of the column Place the head of the wire tires inside the column Cut the air line to length and attach it...

Страница 12: ...20 Fig 20 Adapter Rack Installation ELECTRICAL See Figure 21 for the following steps 64 Wire tie Limit Switch cord to Overhead hydraulic Hose and Power Unit Hose 65 Connect the Overhead Limit Switch C...

Страница 13: ...rods The cylinders are shipped with a small amount of clear anti corosive lubricant that will be forced out through the wiper when the lift reaches full rise If lubricant is not wiped clean from the c...

Страница 14: ...20K 2 Post Lift Installation Operation and Maintenance Page 14 Rev 11 10 2021 EAZ0080V85A Fig 21 Electrical Wiring Diagram 2 T1 1 L1 3 A1 4 A2 LOAD INPUT Normally Open FIELD CONNECTIONS...

Страница 15: ...t the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance wit...

Страница 16: ...st the stability of the vehicle by attempting to rock the vehicle Check adapters for secure contact with vehicle lift points If the vehicle seems unstable lower the lift and readjust the arms If the v...

Страница 17: ...heck for loose or broken parts Check hydraulic system for fluid leaks Check adapters for damage or excessive wear Replace as required with genuine Snap on Equipment parts Check lock release activation...

Страница 18: ...MS 7 10 7 B2065 3 4 M6 x 14mm PHILLIPS PAN HEAD SCREW 8 B2065 4 4 M6 SERRATED FLANGE HEX NUT 9 B2065 5 1 CLEVIS PIN 10mm x 55 Lg 10 GJY12 3 1 HAIRPIN COTTER 11 12330 24 1 2 13NC HEX FLG HD C S x 1 Lg...

Страница 19: ...20K 2 Post Lift Installation Operation and Maintenance Page 19 Rev 11 10 2021 EAZ0080V85A PARTS BREAKDOWN continued Fig B Lock Power Idler...

Страница 20: ...WASHER 29 37119 2 CLEVIS PIN KIT 30 37120 2 ROD END CLEVIS 31 37026 2 AIR CYLINDER 32 37041 2 SWIVEL ELBOW 1 8 PUSH LOCK 33 12088 2 EXTENSION SPRING 34 37042 2 CYLINDER PIVOT ROD 35 37031 4 5 32 SPEED...

Страница 21: ...1 HYD TEE 54 12308 1 POWER UNIT HOSE ASSEMBLY 55 AB 93178 1 POWER UNIT SINGLE PHASE AD 93178 1 OPTIONA POWER UNIT THREE PHASE 56 31025 1 LINE CLAMP 57 40085 9 1 4 20 HEX FLANGE NUT 58 A2125 5 1 4 20...

Страница 22: ...HEAVE ASSEMBLY 67 CL31020 8 WASHER 68 CL31021 4 1 3 8 RETAINING RING 69 12302 0 1 SYNC CABLE PACK 14 6 O A Ht 12302 2 1 SYNC CABLE PACK 16 6 O A Ht 70 40053 2 1 8 THICK BEARING 71 40774 S 2 SHEAVE SPA...

Страница 23: ...NEEDED 87 12072 4 1 2 13 x 5 8 SOCKET HD C S 88 12084 4 1 2 INTERNAL TOOTH LOCKWASHER 92 12091 2 ADAPTER RACK 93 A1153 4 3 8 16NC x 3 4 Lg HEX FLG HD C S 94 A1154 4 3 8 16NC HEX FLG NUT 95 B12068 2 S...

Страница 24: ...tallation Operation and Maintenance Page 24 Rev 11 10 2021 EAZ0080V85A REVISIONS 08 23 2021 CREATED FOR NEW PRODUCT RELEASE 11 10 2021 CORRECT TO NEAREST OBSTRUCTION DIMENSIONS 01 13 2022 Brief proof...

Отзывы: