background image

 

 

 

 

400 LB Lifting Capacity

 

 

500 LB Lifting Capacity Heavy Duty Model

 

 

Non

-

Arcing Lift Beam

 

 

Urethane Sling Retainer Clips

 

 

Vinyl Safety Padding

 

 

Metal Case Batteries with Cushion Grip 
Handles, 12VDC 12Amp./Hr. Gel Cell

 

 

12VDC Ball

-

Screw Actuator with 

1” 

Diameter 

Screw

 

 

Vertical Sliding Adjustable Shin Rest, adjust-
ment range of 9.25 inches

 

 

Horizontal Sliding Adjustable Shin Rest, 
adjustment range of 4 inches

 

 

90 Degree Self

-

Pivoting Shin Rest

 

 

Steel Hand Control

 

 

Powder Coat Paint

 

 

3 Position Positive Lock Leg Adjuster

 

 

3 Position Height Adjustable Footboard 
(Removable)

 

 

User

-

Friendly Scale Option.

 

 

High Impact ABS Leg Covers

 

 

Front Casters 

4” 

Swivel 

(3” 

Optional)

 

 

Rear Casters 

4” 

Swivel w/Brake 

(3” 

Optional)

 

Содержание Volaro Series 4 Stand

Страница 1: ...PA600 Operator s Manual SMT Health Systems 1380 Legion Road Detroit Lakes MN 56501 800 725 7761 www patientlift com Volaro Series 4 Stand...

Страница 2: ...er supplied with the lift Do not exceed the weight limit listed on the lift Do not use a sling that shows wear is torn bleached out or has loose threads Inspect sling before each lift PARTS SERVICE SM...

Страница 3: ..._____ _____________________________Date_____________ Assessment Care Planned by_________________________Date_____________ Can individual safely perform or 50 of lift transfer with only standby assista...

Страница 4: ...Diameter Screw Vertical Sliding Adjustable Shin Rest adjust ment range of 9 25 inches Horizontal Sliding Adjustable Shin Rest adjustment range of 4 inches 90 Degree Self Pivoting Shin Rest Steel Hand...

Страница 5: ......

Страница 6: ...ashing instructions are as follows Brush with warm soapy water and non chlorine disinfectant Rinse Drip dry only The sling rigidity makes it more difficult to machine wash Care should be taken if atte...

Страница 7: ...7...

Страница 8: ...ar down as you can Position the wings of the sling under the arms and make sure they are centered Secure buckle as low as possible around the lower abdomen Fasten the buckle and pull snug Tighten by h...

Страница 9: ...eet off the foot board Be sure to use proper body mechanics by assisting the person to a lying position Transferring from Bed to Chair When transferring from bed to wheelchair it is required that the...

Страница 10: ...ce to operate the lift This allows the operator to be next to the person being transferred and to operate the lift at the same time It also aids as a back up source to operate the lift Figure C Emerge...

Страница 11: ...cause it to overcharge If the power pac goes to GREEN in a short period it may mean you have a weak cell that will not take a full charge Plug power pac into charger every night Do not remove until ch...

Страница 12: ...VOLARO STAND PA600 PA600S PA600 EXPLODED VIEW...

Страница 13: ...PA600 PARTS LIST...

Страница 14: ...age them Circuit Board Wiring Diagram 1 Positive up to Switch Small Green 2 Positive Power Large Red 3 Negative Power Large White 4 Positive to Switch 2 Small Red 5 Safety Switch 2 Small White 6 Up Th...

Страница 15: ...ac 1 Power pac runs down quickly 2 Power pac light stays on 1 Power pac is worn out or not being charged when red charge light comes on lift 2 Power pac is worn out or circuit board is bad 1 Make sure...

Страница 16: ...ds 4 Get supplies ready sling wheelchair blanket or lap robe 5 Get help from experienced team member for this procedure 6 Have assistant stand on opposite side of bed to assist with transfer 7 Provide...

Страница 17: ...member to adjust the safety strap as the resident comes up to keep it snug at all times 20 Lift resident until buttocks have cleared the bed Give assurance to the resident 21 Pull the lift clear form...

Страница 18: ...Check the movement of the lift remove hair from the casters if needed Check leg covers if cracked replace with new ones Check all vinyl covers if worn replace with new ones Check all external fittings...

Страница 19: ...ut 8 Actuator Noise Up Down Replace bearings after 5 years Grease should be greased at least semi annually 9 Power Box Plastic Guides in Place Terminals Remote Jack Holder or Lens 10 Thumb Switches Le...

Страница 20: ...this form for Each Lift Date Checked By Repairs Needed Completed SMT Health Systems www patientlift com sales smthealthsystems com 800 725 7761 Lift Inspection must be done Monthly sling included Mod...

Страница 21: ...Motor Actuator Any Other Moving Parts Limited Warranty on all parts only under conditions of normal and intended use Main Structure Main Integrity and Welds of Frame Base Legs 2YEAR Limited Slings Ma...

Отзывы: