RED-G
32
REV. 9 PRINTED 02/2018
MAKE A CALL FOR THE LIFT, LET IT RUN FOR A WHILE, THEN OPEN THE MAIN
POWER SWITCH AND THE AUXILIARY LIGHT SWITCH WHEN THE CAR IS BETWEEN
TWO FLOORS.
MAKE A JUMPER BETWEEN THE TERMINAL S1-S2, BECAUSE IF THE 4TH POLE IS
OPEN, THE LIFT CANNOT PERFORM THE RESCUE OPERATION
AFTER A FEW SECONDS, THE RESCUE OPERATION STARTS, AND YOU CAN
FOLLOW THE PROGRESS CHECKING THE LED STATUS ON THE RGCON BOARD.
• THE LED A TURNS OFF.
• THE LED B AND KE TURN ON (RESCUE OPERATION IN PROGRESS)
• THE LED CC TURNS ON, IT SHOWS THAT THE KE1 AND KE2 CONTACTOR COILS
ARE SUPPLIED. THEN THE LED CT TURNS OFF, TO SHOW THAT THE CONTACTORS
ARE PROPERLY ENERGIZED, AND THEY CUT THE EXTERNAL 3-PHASE MAINS.
• THE 3-PHASE INVERTER TURNS ON (LEDS UA, VA, WA): THE WHOLE LIFT SYSTEM
IS POWERED AGAIN.
• THEN THE LED BT TURNS ON, IT SHOWS THAT THE MOTOR BRAKE IS SUPPLIED.
C
OMMISSIONING
Содержание RED-G 3000
Страница 39: ...RED G 39 REV 9 PRINTED 02 2018 RED G 3000 INTERNAL DIAGRAM RED G 3000 BOARD SETTINGS 003 11 0500200M...
Страница 40: ...RED G 40 REV 9 PRINTED 02 2018 RED G 4000 INTERNAL DIAGRAM RED G 4000 BOARD SETTINGS 003 11 0500700M...
Страница 41: ...RED G 41 REV 9 PRINTED 02 2018 RED G 8000 INTERNAL DIAGRAM RED G 8000 BOARD SETTINGS 003 08 B0039 003 07 AB400...
Страница 43: ...RED G 43 REV 9 PRINTED 02 2018...