Step 11
:
ROUTING THE AB CABLE:
Insert the cable’s bolt end through
pulley A1 (ball outside), down and
around pulley A2, up and around pulley
A3, down and around pulley A4, up
and around pulley A5 and down to the
weigh stack. Screw the AB cable’s bolt
end into the Select Rod (11) at least
7 threads.
(See Fig A1, A2, A3, A4, A5, A6)
assembly instructions
-20-
ASSEMBL
Y
A1
A2
A3
A4
A5
A6
A6
A3,A5
A4
A1
A2
AB CABLE (37)
ball end
bolt end
Содержание 52551
Страница 7: ...parts diagram 7 MANY PARTS SHOWN HAVE BEEN PRE ASSEMBLED BY THE FACTORY...
Страница 8: ...8 MANY PARTS SHOWN HAVE BEEN PRE ASSEMBLED BY THE FACTORY parts diagram...
Страница 9: ...parts diagram 9 MANY PARTS SHOWN HAVE BEEN PRE ASSEMBLED BY THE FACTORY...
Страница 24: ...notes 24 NOTES...
Страница 25: ...notes 25 NOTES...
Страница 32: ...Smooth Fitness 717 Fellowship Road Suite C Mt Laurel NJ 08054 1 888 800 1167 Copyright 2002...