Step 9
:
ROUTING THE TOP CABLE:
Assemble the cables and pulleys
simutaneously.
Insert the cable’s bolt end through pulley T1
(ball outside), over pulley T2, down and around
pulley T3, down and around pulley T4, over and
around pulley T5, down and around pulley T6,
over and around pulley T7, down and around
pulley T8, over and around pulley T9 and down
to the weight stack. Screw the Top Cable bolt
end into the select Rod (11) at least 7 threads.
(See Fig T1, T2, T3, T4, T5, T6, T7, T8, T9, T10
& Fig 1, Fig 2)
assembly instructions
-18-
ASSEMBL
Y
T2
T1
T3
T4
T5
T6
T7
T8
T9
T10
TOP CABLE (36)
ball end
bolt end
T1
T3,T5
Fig1
Fig2
T2,T6
T8
T4,T7,T9
T10
Содержание 52551
Страница 7: ...parts diagram 7 MANY PARTS SHOWN HAVE BEEN PRE ASSEMBLED BY THE FACTORY...
Страница 8: ...8 MANY PARTS SHOWN HAVE BEEN PRE ASSEMBLED BY THE FACTORY parts diagram...
Страница 9: ...parts diagram 9 MANY PARTS SHOWN HAVE BEEN PRE ASSEMBLED BY THE FACTORY...
Страница 24: ...notes 24 NOTES...
Страница 25: ...notes 25 NOTES...
Страница 32: ...Smooth Fitness 717 Fellowship Road Suite C Mt Laurel NJ 08054 1 888 800 1167 Copyright 2002...