16
Assembly
Step 16
Fig. 16A
Fig. 16E
Step 16: Assemble Side Burner Shelf
Assembly
Locate
: Side Burner Valve is pre-assembled on
the Control Panel Assembly, Side Burner Ig-
niter Wire is pre-assembled on the Side Burner
Shelf Assembly, (6) M6x12 bolts, (2) M4x8
bolts
Procedure:
Attach (1) M6x12 bolt to the left of the cabinet
as shown as Fig. 16A.
NOTE: DO NOT
TIGHTEN THE BOLT AT THIS TIME.
Then hang the Side Burner Shelf Assembly on
the bolt and push the Side Burner Shelf As-
sembly down.
Attach the upper part of the Side Burner Shelf
Assembly to the cabinet using (2) M6x12 bolts
as shown as Fig. 16B.
Attach the Side Burner Shelf and Side Burner
Control Panel Assembly to the Left Rear Leg
#3 and Left Front Leg #4 using (3) M6x12 bolts
as shown as Fig. 16C.
Note: When screwing the bolt to the Left Front
Leg #4, attach Match Holder and Chain by in-
serting the (1) M6x12 bolt through the loop of
the chain and securely tightening as shown
as Fig. 16C.
Then Tighten the bolt pre-assembled on step
16A.
Insert the Valve Stem into the hole on the Con-
trol Panel as shown as 16D.
Attach the
Side Burner Valve to the Side Burner
Control Panel
using (2) M4x8 bolts as shown as
Fig. 16E.
Fig. 16B
Fig. 16C
Fig. 16D