43
Accessories
45-503 84" RAKE ASSEMBLY PARTS LIST
REF# PART#
DESCRIPTION
QUANTITY
1* HB-58-11-400 Bolt,
5
/
8
- 11 x 4
2
HMB-58-14
Machine Bushing,
5
/
8
x 14GA
2
HNCL-58-11
Lock Nut,
5
/
8
- 11
2
2
45-588
Draw bar
1
3*
HCP-12-150
Clevis Pin,
1
/
2
- 1
1
/
2
2
4*
HP-18-100
Cotter Pin,
1
/
8
x 1
2
5 76-275
Spacer
2
6
45-590
Right Rake Frame
1
7
45-586
Grooming Blade
3
8* HB-516-18-075 Bolt,
5
/
16
- 18 x
3
/
4
6
HNFL-516-18
Flange Lock Nut,
5
/
16
- 18
6
9*
HBFL-516-18-075
Flange Lock Bolt,
5
/
16
- 18 x
3
/
4
20
HNTL-516-18
Nylon Lock Nut,
5
/
16
- 18
20
HW-516
Flat Washer,
5
/
16
20
10
13-757
Rake Connect Strap
10
11
45-589
Center Rake Frame
1
12
13-443
Finishing Blade
2
13
13-445
Rake Teeth Kit (27 per kit)
1
11-066
Rake Teeth
4
HN-38-16
Nut,
3
/
8
8
HWL-38
Lockwasher,
3
/
8
4
14
45-591
Left Rake Frame
1
15
45-587
Finishing Blades
3
*
13-764
Hardware Kit
1
INSTALLATION INSTRUCTIONS
1� Bolt 31 rake teeth (Ref 13) to frames, keeping all the same length�
2� Lay out rake frames (Ref 6, 11 & 14)� Connect them using clevis pin (Ref 3), Spacer (Ref 5) and cotter
pin (Ref 4)�
3� Attach left frame (Ref 14) and right frame (Ref 6) to draw bar (Ref 2) using
5
/
8
bolt, machine bushing,
and center lock nut (Ref 1)�
4� Attach the three groomer blades (Ref 7), one to each of the rake frames (Refs 6, 11 & 14) using two hex
bolts and flange lock nuts (Ref 8). Slide groomer blades to end of slot and tighten hardware.
5. Attach three large finishing blades (Ref 15) and then the two smaller finishing blades (Ref 12) to the
tabs of the rake frames using two rake connect strap (Ref 10) per finishing blade. Secure, using flange
lock bolt, flat washer and nylon lock nut (Ref 9).
NOTE: Attach Straps using hardware as illustrated, placing Flat Washer on Strap then secure
with Lock Nut� Attaching with the Flange Bolt in contact with the Strap will cause the Strap to
bind and misalign Finishing Blade�
6� Attach the rake to the trap rake quick hitch by sliding the draw bar hitch into the spring loaded locking
mechanism�
7� With the rake on the ground pull the rake to the right side until it is 2-3 inches from the tire�
8� Repeat steps on left side�
9� Turn machine on and test for operation of rake assembly by raising and lowering the rake assembly�
Also with rake down, turn sharp corners to check that rake does not touch wheels�
10�
NOTE:
Test rake in sand to assure tire tracks are covered by the rake when turning sharp corners in
either direction� If there are tire tracks, readjust using the adjusting screws on the hitch, so the rake
comes closer to the tire�
Содержание Sand Star Zee 45-501-A
Страница 18: ...16 Diagrams HYDRAULIC DIAGRAM ...
Страница 20: ...18 Parts ZTR MAIN DRAWING ...
Страница 24: ...22 Parts SEAT PANEL DRAWING ...
Страница 26: ...24 Parts CONTROL PANEL GAS TANK DRAWING ...
Страница 28: ...26 Parts ROLL BAR OIL TANK DRAWING ...
Страница 30: ...28 Parts CENTER LIFT LINKAGE DRAWING ...
Страница 32: ...30 Parts ELEC HYD REAR LIFT DRAWING ...
Страница 34: ...32 Parts REAR HITCH DRAWING ...
Страница 36: ...34 Parts ENGINE DRAWING ...
Страница 38: ...36 Accessories 45 510 LIGHT KIT DRAWING ...
Страница 40: ...38 Accessories 45 502 40 ALUMINUM PLOW DRAWING ...
Страница 42: ...40 Accessories 45 502 40 ALUMINUM PLOW DRAWING ...
Страница 44: ...42 Accessories 45 503 84 RAKE ASSEMBLY DRAWING ...
Страница 46: ...44 Accessories 45 504 FLIP DOWN GRADER BLADE DRAWING ...
Страница 48: ...46 Accessories 45 505 SPRING TINE SCARIFIER DRAWING ...
Страница 50: ...48 Accessories 45 506 SAND CULTIVATOR DRAWING ...
Страница 52: ...50 Accessories 45 507 SCARIFIER DRAWING ...
Страница 54: ...52 Accessories 45 509 SCARIFIER DRAWING ...
Страница 56: ...54 Accessories 26 007Q PROFESSIONAL INFIELD FINISHER DRAWING ...
Страница 58: ...56 Accessories 26 008Q FLEX ACTION FIELD FINISHER DRAWING ...
Страница 62: ...60 Accessories 42 392Q 84 213CM Pro Brush TOURNAMENT RAKE DRAWING ...
Страница 64: ...62 Accessories Fig 1 Fig 3 Fig 2 42 392Q 84 213CM Pro brush TOURNAMENT RAKE DRAWING ...