11. 

The  transformer's  primary  and  secondary  voltages  can  be 

checked with a voltmeter and the voltages recorded.

ANNUAL CHECKS

12. 

The Manual Reset High Limit may be checked by recording 

the temperature settings, changing the auto reset limit (auto 

reset limit may require temporarily jumping the 2 terminals 

to  bypass  the  control  for  higher  temperature)  and  system 

controller to a higher set point than the limit itself and running 

the boiler. Allow the boiler to shut down on Manual High Limit. 

After shut down, the boiler should not fire up until the manual 

reset button is depressed and power to the unit is reset. The 

auto reset limit and the system controller may be tested in 

similar fashion but a shut down on either will not require the 

power to the boiler to be reset. Note: If jumper wire was used 

be sure to remove it. Return all temperature settings to the 

original positions upon completion of test.

13. 

Redundant  Safety  Gas  Valves  may  be  checked  for  proper 

closure upon shutdown and should stop the flow of gas to the 

burner within five (5) seconds of being de-energized.
Downstream  of  each  valve  is  a  smaller  leak  test  valve. 

Removal  of  the  plug  will  allow  the  connection  of  a  gas 

pressure gauge for the purpose of testing - see Figure 1 on 

Page 3.

The  Redundant  Safety  Gas  Valve  first  valve  seat  may  be 

checked with the boiler off. Close the manual valve located 

ahead of the redundant valve. Open the first leak test valve, 

note  the  gauge  pressure  and  verify  it  is  stable.  Open  the 

manual valve allowing gas to flow against the first valve seal. 

A steady increase in gas pressure indicates gas is leaking 

past  the  valve  seat  and  the  redundant  valve  should  be 

replaced.
To check the second redundant valve seat, first disconnect 

the  electrical  supply  wire  (brown)  from  TH  terminal  on 

redundant valve. With the firing valve closed, open the leak 

test  valve  downstream  of  the  redundant  safety  valve,  note 

the gauge pressure and verify it is stable.
Operate the boiler to call for heat allowing the pilot burner 

to  light. The  first valve  seat  will  open  allowing  gas  against 

the  second  valve  seat. A  steady  increase  in  gas  pressure 

indicates fuel is leaking past the second valve seat and the 

redundant valve should be replaced.

14. 

The  sediment  trap  (dirt  leg)  and  gas  strainer  (if  required) 

should be inspected periodically for accumulation of foreign 

debris  that  could  cause  blockage.  Gas  should  be  shut  off 

ahead of the particular device to be cleaned or inspected to 

prevent gas leakage.

INSTRUCTIONS FOR TESTING AND MAINTENANCE

DAILY CHECKS

1. 

Thermometers  and  temperature  gauges  should  be  visibly 

inspected on a daily basis for normal operation. These items 

should be noted and the differential temperatures recorded 

during operation. If the temperature differential increases by 

five (5) degrees Fahrenheit (3 degrees C) over the original 

installation,  a  general  deliming  of  the  heat  exchanger  may 

be required.

2. 

Visually  inspect  main  burner  flame  by  viewing  upwards 

between  the  burners  from  the  front  bottom  of  the  boiler. 

Inspect for well-defined blue flames. Check for smooth light-

off.

3. 

Visually inspect pilot burner for a well-defined flame pattern. 

Pilot flame should envelop 3/8 to 1/2 inch (9 to 12 mm) of the 

top of the insulated rod on the pilot burner.

WEEKLY CHECKS

4. 

When  satisfied,  or  on  lockout,  the  main  gas  valves  should 

shut  off  within  five(5)  seconds.  With  the  system  operating, 

momentarily  turn  the  system  controller  down  to  shut  down 

the boiler. Listen for valve closure, noting timing. Verify that 

there is no voltage present at the valves. Return the system 

controller to its normal setting.

5. 

When a pilot flame failure is detected the boiler should shut 

off within four (4) seconds. With the boiler operating, close 

the manual pilot shut-off valve, which is located in the pilot 

gas supply line.
Note gas valve closure time. Verify that there is no voltage 

present at the valves.

6.  Flow  switch  operation  is  checked  by  verifying  the  switch 

position during operation. With the cover removed, and water 

flowing through the system, observe that the switch closes 

the  circuit  between  terminal  #1  (common)  and  terminal  #2 

(flow closes circuit). When flow stops, this switch will open 

the circuit, shutting down the boiler. Note your observations.

MONTHLY CHECKS

7.  The flue collector and draft hood are to be visually inspected 

internally for any signs of deterioration. Significant corrosion 

can signal high moisture content or chemical reactions in the 

flue gases. The use of a mirror and light source allows for 

easy inspection through the draft hood opening.

8. 

On  optional  power  vent  system,  the  blower  prover  switch 

may be checked by disconnecting the pressure switch tube. 

The boiler will shut down if already operating, or not start if it 

is not. Reconnecting the tube will allow the boiler to fire. Note 

your observations.

SEMI-ANNUAL CHECKS

9. 

Burners shall be maintained per the operating instructions of 

the Instruction Manual.

10. 

The heat exchanger is to be visually inspected for build up of 

deposits or tube distortion. This is best accomplished when 

the burners are removed for their inspection. Light deposits 

are  to  be  brushed  clear.  Heavy  deposits  or  tube  repairs 

may require removal of the heat exchanger. As well, heavy 

deposits may indicate the need for more frequent inspections 

and changes in operating parameters. Refer to the Instruction 

Manual regarding air supply and corrosion.

Содержание HW 420

Страница 1: ...rity having jurisdiction requires that the installation must conform to the standard for Controls and Safety Devices for Automatically Fired Boilers ASME CSD 1 The rules of the code cover the requirem...

Страница 2: ...TROL DIAGRAM 3 WIRING DIAGRAM 4 OPERATING SEQUENCE 5 OPERATING SEQUENCE WHEN WIRED AS SHOWN 5 TESTING AND MAINTENANCE 6 INSTRUCTIONS FOR TESTING AND MAINTENANCE 7 DAILY CHECKS 7 WEEKLY CHECKS 7 MONTHL...

Страница 3: ...information on this Hot Water Boiler installation see Instruction Manual 321078 000 The wiring changes brought about by the addition of the Figure 2 manual reset High Limit and the Flow Switch are ref...

Страница 4: ...4 Figure 3 WIRING DIAGRAM WIRING DIAGRAM...

Страница 5: ...the pump providing sufficient water flow the flow switch will close contacts allowing power to be supplied to the transformer through the manual reset high limit 4 Power continues through the normally...

Страница 6: ...nd safety devices operating as intended at all times a periodic testing and maintenance schedule should be set up and followed with results being logged on a regular basis Operators or maintenance tec...

Страница 7: ...bly inspected on a daily basis for normal operation These items should be noted and the differential temperatures recorded during operation If the temperature differential increases by five 5 degrees...

Страница 8: ...8 25589 Highway 1 McBee SC 29101 Technical Support 800 527 1953 Parts 800 433 2545 Fax 800 644 9306 www hotwater com...

Отзывы: