OPERATING SEQUENCE

All units are built with an ignition control module that provides the 

ignition sequence, pilot flame monitoring, and safety shut off of 

the gas valves. The CSD-1 ignition control modules are of two 

15 seconds pilot trials with 5 minutes waiting period between the 

two trials. If the pilot flame is not established/confirmed during 

the first 15 seconds ignition trial, or if the pilot flame signal is lost 

after main burner is ON, the United Technologies (UT) ignition 

module will de-energize the gas valve and wait for 5 minutes. It 

will start one more 15 seconds trial for ignition. If the pilot flame 

is still not established, the alarm contacts on the ignition module 

will be energized, which will cause the CSD-1 lockout module to 

shut down the power to the ignition module and illuminate the red 

LED. The ignition module will be in "Lockout" mode until the reset 

button on the lockout module is pressed.

OPERATING SEQUENCE WHEN WIRED AS SHOWN

1. 

With power supplied the unit becomes activated.

2. 

When the System Controller (i.e., tank temperature control, 

thermostat, building controller, etc.) closes "calling for heat", 

power  will  activate  the  circulating  pump.  Power  is  also 

supplied to the normally open contacts of the flow switch.

3. 

With the pump providing sufficient water flow, the flow switch 

will  close  contacts;  allowing  power  to  be  supplied  to  the 

transformer through the manual reset high limit.

4. 

Power  continues  through  the  normally  closed  auto  reset 

high limits to energize the ignition control module. Opening 

the contacts on either high limit immediately shuts down the 

control module.

5. 

Once  energized,  the  control  module  tries  for  ignition  by 

starting a control timer, opening the pilot gas valve (PV) and 

generating a high voltage pulse. Gas and ignition sparks are 

supplied at the pilot until the pilot lights or the control timer 

terminates the ignition trial.
If the pilot does not light, or the module does not recognize 

a stable flame, the module will de-energize the gas valve for 

5 minutes, then starts the second and last 15 second trial for 

ignition.

6.  When  the  pilot  flame  has  been  established  and  accepted 

by  the  control  module  sensing  circuit,  power  is  allowed  to 

energize the main gas valve (MV). This valve opens, allowing 

gas to flow to the main burner which is then ignited by the pilot 

flame. Failure of the pilot flame at any time during operation 

will cause the control module to shut down the gas valve.

7.  The  system  continues  to  operate  until  "call  for  heat"  is 

satisfied.  The  unit  then  shuts  down.  The  thermal  balancer 

keeps  the  pump  operating  approximately  one  (1)  extra 

minute for heat exchanger post-purge. The unit will continue 

to operate automatically as required.

Содержание HW 420

Страница 1: ...rity having jurisdiction requires that the installation must conform to the standard for Controls and Safety Devices for Automatically Fired Boilers ASME CSD 1 The rules of the code cover the requirem...

Страница 2: ...TROL DIAGRAM 3 WIRING DIAGRAM 4 OPERATING SEQUENCE 5 OPERATING SEQUENCE WHEN WIRED AS SHOWN 5 TESTING AND MAINTENANCE 6 INSTRUCTIONS FOR TESTING AND MAINTENANCE 7 DAILY CHECKS 7 WEEKLY CHECKS 7 MONTHL...

Страница 3: ...information on this Hot Water Boiler installation see Instruction Manual 321078 000 The wiring changes brought about by the addition of the Figure 2 manual reset High Limit and the Flow Switch are ref...

Страница 4: ...4 Figure 3 WIRING DIAGRAM WIRING DIAGRAM...

Страница 5: ...the pump providing sufficient water flow the flow switch will close contacts allowing power to be supplied to the transformer through the manual reset high limit 4 Power continues through the normally...

Страница 6: ...nd safety devices operating as intended at all times a periodic testing and maintenance schedule should be set up and followed with results being logged on a regular basis Operators or maintenance tec...

Страница 7: ...bly inspected on a daily basis for normal operation These items should be noted and the differential temperatures recorded during operation If the temperature differential increases by five 5 degrees...

Страница 8: ...8 25589 Highway 1 McBee SC 29101 Technical Support 800 527 1953 Parts 800 433 2545 Fax 800 644 9306 www hotwater com...