
IDX-OM-V024
Chapter 12
Option V
12.3
Maintenance
IDFB60/70/80/90 Series
12-2
12.3 Maintenance
Be sure to perform regular maintenance of the strainer.
Follow the following steps to perform maintenance.
1) Close the ball valve.
2) Press the test switch to release the residual pressure.
3) Remove the strainer and clean it.
4) Mount the strainer and open the ball valve.
.
Strainer cap
Test switch
Ball valve
OFF time adjustment dial
ON time adjustment dial
Strainer
5
4
3
2
1
0.5
10
8
6
4
2
0.5
min
s
OFF
ON
Strainer is built in here
Содержание IDFB60-23-C
Страница 26: ...IDX OM V024 Chapter 5 Checks and Maintenance 5 2 Regular maintenance IDFB60 70 80 90 Series 5 4 ...
Страница 36: ...IDX OM V024 Chapter 7 Documents 7 5 Air Refrigerant Circuit IDFB60 70 80 90 Series 7 6 ...
Страница 38: ...IDX OM V024 Chapter 8 Option C 8 2 Precautions for installation and handling IDFB60 70 80 90 Series 8 2 ...
Страница 50: ......
Страница 51: ......