
IDX-OM-V024
Chapter 3
Transportation and installation
3.2
Installation
IDFB60/70/80/90 Series
3-6
Wiring procedure
(1) Remove the front panel.
(2)
Pass the cable through the strain relief to connect to the terminal block. (refer to the label on the
terminal block)
M3.5
Screw tightening torque : 1.0 to 1.3N
・
m
M4.0
Screw tightening torque : 1.4 to 2.0N
・
m
Do not touch any equipment other than the terminal block during wiring.
(3) Mount the front panel back.
Terminal block
Front panel
Strain relief
Power supply cable entry
[Terminal block]
L1 L2
Содержание IDFB60-23-C
Страница 26: ...IDX OM V024 Chapter 5 Checks and Maintenance 5 2 Regular maintenance IDFB60 70 80 90 Series 5 4 ...
Страница 36: ...IDX OM V024 Chapter 7 Documents 7 5 Air Refrigerant Circuit IDFB60 70 80 90 Series 7 6 ...
Страница 38: ...IDX OM V024 Chapter 8 Option C 8 2 Precautions for installation and handling IDFB60 70 80 90 Series 8 2 ...
Страница 50: ......
Страница 51: ......