HRX-OM-I051
Chapter 4 System Startup and Shutdown
HRZ Series
4.3 Supply of Circulating Fluid
4-3
4.3.2
Supply of circulating fluid
Remove the circulating fluid fill cap, and fill the circulating fluid until it reaches its
specified level.
The circulating fluid specified level is a range between “HIGH” and “LOW” in
Figure 4-1.
Be sure to tighten the cap until it clicks after fluid supply.
If the circulating fluid is supplied over the specified level, follow the procedure
provided in section 7.3.1 “Draining of circulating fluid out of tank” on page 7-4 to
drain excess fluid until it reaches the specified level.
[Tips]
Level between “HIGH” and “LOW” represent liquid level in normal running
condition. Immediately as you start filling up the chiller, the internal
transferring pump start pumping fluid from the Sub Tank into the Main Tank.
Thus the fluid level in the level gauge will start to drop.
During initial priming of the external piping, addition fluid is needed. See
section 8.1.1
“System specification” on page 8-1 for Sub Tank and Main Tank
capacity.
When supplying the circulating fluid, make sure that the fluid inside
this system has dropped to room temperature for the prevention of
burns.
Circulating fluid must be supplied to be in the range between “HIGH”
and “LOW”. Potential overflow of hot circulating fluid may occur due
to excessive volume.
Total fluid volume use to fill up the system including initial priming
should not exceed combined volume of Sub Tank and Main Tank.
If level is below the “LOW” mark, this system will trigger an alarm.
To prevent moisture, which is formed by condensation of a flowed air,
from finding its way into the tank, ensure the circulating fluid at room
temperature when supplying the fluid.
Be sure to tighten the cap until it clicks after fluid supply.
Potential circulating fluid vaporization or moisture intrusion due to
condensation of flowed air may occur if disregarded.
Содержание HRZ001-H
Страница 6: ...HRX OM I051 Table of Contents HRZ Series TOC 4...
Страница 40: ...HRX OM I051 Chapter 3 Transporting and Installation 3 3 Procedure for Installation HRZ Series 3 16...
Страница 46: ...HRX OM I051 Chapter 4 System Startup and Shutdown 4 5 System Startup and Shutdown HRZ Series 4 6...
Страница 62: ...HRX OM I051 Chapter 5 System Operation 5 4 Examples of System Operation HRZ Series 5 16...
Страница 66: ...HRX OM I051 Chapter 6 Error Message and Troubleshooting 6 2 Troubleshooting HRZ Series 6 4...