- 9 -
2-3. Piping
Caution
1)
Refer to the Fittings and Tubing Precautions (web catalog) for handling One-touch
fittings.
2) Preparation before piping
Before piping is connected, it should be thoroughly blown out with air (flushing) or washed
to remove chips, cutting oil, and other debris from inside the pipe.
3) Winding of sealant tape
When screwing piping or fittings into ports, ensure that chips from the pipe threads or sealing
material do not enter the piping. Also, if sealant tape is used, leave 1.5 to 2 thread ridges
exposed at the end of the threads.
4) The following fittings are recommended for this cylinder connection. However,
there may be case where the piston speed exceeds 500 mm/sec. even with the
recommended fittings for this cylinder. Use a speed controller in such cases.
Winding
direction
Sealant tape
Expose approx. 2 threads
8
Содержание CJP Series
Страница 14: ... 13 3 Construction Description ...
Страница 16: ... 15 4 2 Accessory bracket dimensions ...