TECHNICAL INFORMATION
TRAMPOLINE S
If you have any questions, we’d be happy to help:
smb Seilspielgeräte GmbH Berlin in Hoppegarten
Fon.
+49 (0) 3342 50837-20
Technikerstraße 6/8
Fax.
+49 (0) 3342 50837-80
www.smb.berlin
DE-15366 Hoppegarten
09.04.2020
Page 3 von 9
1.4 Mounting
Once the soil has been excavated (450 mm deep) and a horizontal, even surface hase been created, the
trampoline is set up. If the ground prevents or at least hinders the ingress of water, e.g. if the soil is clay-based,
then a drainage layer should be installed.
There are a total of four drill holes (sealed with stoppers) on the sides of the frame. The bearing irons supplied
are guided through these to transport the trampoline and position it in the excavated pit (please seal the drill
holes again afterwards!). Care must be taken to ensure that the frame is positioned squarely and does not tilt.
Then fill in and seal any open spaces between the ground and the trampoline frame. The play level must be
established with shock-absorbing properties, e.g. with molded fall protection, depending on the plans.
Play level
Drill holes for bearing
Fig. 1 – Removing soil, dimensions