background image

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  Alle Rechte und Produktmodifikationen vorbehalten

Stand: 20.06.2016 S. 1

Mounting instructions for climbing equipment  „retis 2“ 

Artikel-Nr. 51 5515 401

Diagramm 1: Overall view play equipment

Содержание retis 2

Страница 1: ...heck 56271 Kleinmaischeid Tel 49 0 2689 92790 0 Alle Rechte und Produktmodifikationen vorbehalten Stand 20 06 2016 S 1 Mounting instructions for climbing equipment retis 2 Artikel Nr 51 5515 401 Diagramm 1 Overall view play equipment ...

Страница 2: ... foundation anchor as shown in Diagram 2 and 3 After excavation compress the foundation floor Note The climbing equipment is built in on the play level Pay attention to items marked game level of play equipment 3 Set up the 2 main concrete foundations LxWxH 600 x 1200 x 400mm in the quality class C 20 25 according to the dimensions indicated in diagram 2 and 3 4 After a setting period of 10 14 day...

Страница 3: ...6 Fill up and compress the holes between the foundation and the foundation hole with the excavation 7 Seal the foundation with the safety cover required for the height of fall indicated Critical drop height 2600 mm Recommended surface material sand wood chip gravel synth fall protection 8 After 3 months check the screws at the joints and retighten them if necessary 9 Do not allow children to use t...

Страница 4: ...e of maintenance of the stainless surface even despite of their corrosion resistance Especially areas which can not be reached by rainfall should be frequently cleaned from dirt and deposits due to air pollution and dirt caused by the atmos phere Light soiling can easily be removed by using a high pressure cleaner For persistent deposits use a clean cloth moistened with a special liquid cleaner e ...

Отзывы: