8
Step 3 - Installing the SRU Software
Warning: Your laptop needs to be fully charged for this process, plugging in your laptop to an
AC source while installing software could result in damage to the SRU Board. Also, do not
disconnect the programmer pod from the SRU board while the controller is being programmed.
Identify which controller you are installing, Machine room, Car-Top, COP.
Instructions for Programming a NEW Machine Room Controller
1.
A controller cannot be programmed if unpowered, ensure that you have 24V supplied to
the controller.
2.
Turn on
Dip Switch 1 (Dip A)
. When you activate
Dip Switch 1
you should see a “F77: CPU
Stop Switch” fault on the controller. Do not be alarmed – this is normal.
3.
Plug the programming pod’s ribbon cable connector into the
J21
port first. Select the J21
checkbox on the Smartrise programming application show below.
4.
Next, click the “
Begin Programming
” button on the bottom of the programming interface
to begin programming your board.
5.
Notice the progress report bar, when programming is finished, you will see a
a.
"
Progress: Done
” when programming is finished.
b.
NOTE: You will also want to verify that the POWER and RUN LED’s on the
programming pod itself are off before disconnecting from a controller.
6.
Next move your programming pod from port J21 to
J22
, then click on the J22 check box
and begin programming.
7.
When programming is finished:
CYCLE POWER
–
**
DO NOT PRESS THE RESET BUTTON
**
8.
IF REPROGRAMMING AN EXISTING SRU BOARD
– Don’t perform the
DEFAULT ALL
procedure as this will erase all existing settings. Skip to Step #10.
9.
IF PROGRAMMING A NEWLY INSTALLED MR SRU BOARD ONLY
– Go to
MAIN MENU |
SET UP | DEFAULT ALL |
select “Yes” and press the center button. The controller will begin
defaulting all the factory parameters to original programming (This could take several
minutes).
10.
Once this is finished, cycle power again.
11.
When the controller is fully powered and finished loading, turn off
Dip Switch 1
.
12.
Verify that the controller is programmed correctly. This is done by going to the
MAIN
MENU | ABOUT
screen. If all the information is correct, the Machine Room Controller
has been successfully programmed.