background image

 

10 

 

Instructions for Programming a Group Controller for Non-Simplex jobs 

The group controller software will be located in the Controller Software folder. 

 

 

 

 

Locate  the  folder  with  the  group  software  in  it.  The  folder  will  clearly  be  labeled  “Group 
Software.” After locating the folder, proceed below. 

1.

 

A controller cannot be programmed if unpowered, ensure that you have 24V supplied to 
the controller. 

2.

 

Activate 

Dip Switch #1

 on the group controller. (The group controller will not fault like 

the machine room controller)  

3.

 

Plug  in  the  programming  pod  into  the  J21  port  first.  Select  the  J21  checkbox  on  the 
Smartrise programming application show below. 

 

 

 

4.

 

Next, click the “

Begin Programming

” button on the bottom of the programming interface 

to begin programming the board. 

5.

 

Notice the progress report bar, when programming is finished, the LCD display will show 
"

Progress: Done

”. NOTE: Verify that the POWER and RUN LED’s on the programming pod 

itself are off before disconnecting it from a controller. 

6.

 

Next move the programming pod from port J21 to J22, click on the J22 check box and the 
“Begin Programming” button. 

7.

 

When programming is finished:   

 

CYCLE POWER

 – 

**

 

DO NOT PRESS THE RESET BUTTON

 

**

 

8.

 

Next, go to the 

MAIN MENU | SET UP | DEFAULT ALL | 

select “Yes” and press the center 

button.  The  controller  will  begin  to  default  all  the  factory parameters  (This  could  take 
several minutes).  

9.

 

Once this is finished, cycle power again. 

10.

 

When the controller is fully powered and finished loading, turn off 

Dip Switch 1

11.

 

Verify  that  the  controller  is  programmed  correctly.  This  is  done  by  going  to  the 

MAIN 

MENU  |  ABOUT

.

   

If  all  the  information  is  correct,  the  controller  software  has  been 

successfully installed.

 

Содержание SRU

Страница 1: ...PROGRAMMING INSTRUCTIONS for SRU Boards www smartrise us 1235 N Union Bower Rd Irving TX 75061 916 457 5129 ...

Страница 2: ... Revision 5 7 Board POWER TERMI NAL DIP SWITCH Inputs 525 532 Inputs 517 524 Inputs 501 508 Inputs 509 516 Outputs 601 608 Outputs 601 608 LCD SCREEN Drive Port AUX Port NET Ports JTAG PROGRAMMING PORTS LCD NAVIGATION Dip Switch 1 ...

Страница 3: ... SCREEN JTAG PROGRAMMING PORTS Inputs 525 532 Drive Port AUX Port NET Ports Inputs 517 524 Inputs 533 540 Inputs 501 508 Inputs 509 516 Inputs 549 552 Outputs 601 608 Outputs 601 608 DIP SWITCH B sSWITC HES Inputs 541 548 Outputs 617 624 LCD NAVIGATION ...

Страница 4: ... board with either the CT or COP board 2 Reprogram it as the MR board DO NOT USE DIP SWITCH 1 DEFAULT ALL AFTER PROGRAMMING 3 Install the new board as the CT or COP board and program it as such The previous settings in the reprogrammed MR board will then transfer to the new board and the car should operate as before with all the original settings You can replace either the CT or COP board anytime ...

Страница 5: ...lity to extract the file to a location of your choosing If not you will need to download a free program from the internet to process this file 2 Navigate to the location you saved the file and double click on it to show the contents 3 Some laptops won t allow the Smartrise programmer to run directly from a zip file To resolve this you need to copy all the contents of the zip file to a folder on yo...

Страница 6: ...tware If not install the application by doing the following 1 Open the 5 New Smartrise Programmer Folder in your software package 2 Open the 1 Programmer Installer Folder 3 Install the Smartrise Programmer 4 Once the Smartrise Programmer is installed go back to the index of folders shown below and open the 1 Controller Software folder with the JCF Software file inside shown below ...

Страница 7: ...b is 6 Open the JCF file by double clicking on it If it doesn t open then the Smartrise Programmer might not be correctly installed Please see previous page for installation instructions The Smartrise Programmer interface Note All the controller software is located on this interface except the group software ...

Страница 8: ... appears then open My Computer and click on the CD ROM drive 2 Click on the Open folder to view files option to explore the Smartrise CD folders A list of folders with the software will appear The software is located in the 1 Controller Software folder It is imperative that you install the correct software onto the correct JTAG port To do this first connect your Smartrise programmer to your laptop...

Страница 9: ...rd 5 Notice the progress report bar when programming is finished you will see a a Progress Done when programming is finished b NOTE You will also want to verify that the POWER and RUN LED s on the programming pod itself are off before disconnecting from a controller 6 Next move your programming pod from port J21 to J22 then click on the J22 check box and begin programming 7 When programming is fin...

Страница 10: ...ng interface to begin programming the board Notice the progress report bar when programming is finished the display will show Progress Done NOTE Verify that the POWER and RUN LED s on the programming pod itself are off before disconnecting from the controller Next move the programming pod from port J21 to J22 click on the J22 check box and then Begin Programming When programming is finished CYCLE ...

Страница 11: ...gin programming the board 5 Notice the progress report bar when programming is finished the LCD display will show Progress Done NOTE Verify that the POWER and RUN LED s on the programming pod itself are off before disconnecting it from a controller 6 Next move the programming pod from port J21 to J22 click on the J22 check box and the Begin Programming button 7 When programming is finished CYCLE P...

Отзывы: