
FY303 – Operation, Maintenance and Instructions Manual
3.32
Figure 3.25 - Step 3 - FY303
Figure 3.26 - Step 4 – FY303
Figure 3.27 - Step 5 – FY303
In this option TYPE,
is indicated by the
numbers 1 or 2,
which respectively
represent Linear or
Rotary valves.
Place the magnetic
tool in orifice
Z
. In
case this is the first
configuration, the
option shown on the
display is the TAG
with its corresponding
mnemonic configured
by the Configuration
Tool. Otherwise, the
option shown on the
display will be the one
configured in the prior
operation. By keeping
the tool inserted in
this orifice, the local
adjustment menu will
rotate.
In order to start the
LOPOS, simply insert
the magnetic tool in
orifice
S
as soon as
LOPOS is shown on
the display. An arrow
pointing upward (
-
)
increments the valve
and an arrow
pointing downward
(
¯
) decrements the
valve. In order to
increment the lower
position valve, keep
the tool inserted in
S
.
In order to
decrement the
lower position
valve, place the
magnetic tool in
orifice
Z
to shift
the arrow to the
downward
position and then,
by inserting and
keeping the tool
in orifice
S
, it is
possible to
decrement the
lower position
valve.
In order to start the
UPPOS, simply
insert the magnetic
tool in orifice
S
as
soon as UPPOS is
shown on the
display. An arrow
pointing upward (
-
)
increments the
valve and an arrow
pointing downward
(
¯
) decrements the
valve. In order to
increment the upper
position valve, keep
the tool inserted in
S
.
In order to
decrement the
upper position
valve, place the
magnetic tool in
orifice
Z
to shift the
arrow to the
downward position
an then, by
insetting and
keeping the tool in
orifice
S
, it is
possible to
decrement upper
position valve.
Содержание fy303
Страница 1: ...OPERATION MAINTENANCE AND INSTRUCTION MANUAL Profibus PA Valve Positioner JUL 16 F Y 3 0 3 M E...
Страница 7: ...Kpuvcnncvkqp Hnqyejctv XKK Kpuvcnncvkqp Hnqyejctv...
Страница 8: ...H 525 Qrgtcvkqp Ockpvgpcpeg cpf Kpuvtwevkqpu Ocpwcn XKKK...
Страница 20: ...FY303 Operation Maintenance and Instructions Manual 1 12...
Страница 26: ...FY303 Operation Maintenance and Instructions Manual 2 6...
Страница 69: ...Configuration 3 43 Figure 10 Sensor Pressure Configuration Data...
Страница 70: ...FY303 Operation Maintenance and Instructions Manual 3 44...
Страница 88: ...FY303 Operation Maintenance and Instructions Manual 5 6...
Страница 94: ...H 525 Qrgtcvkqp Ockpvgpcpeg cpf Kpuvtwevkqpu Ocpwcn C08...
Страница 95: ...Egtvkhkecvkqpu Kphqtocvkqp C09 Eqpvtqn Ftcykpi FM Approvals Factory Mutual...
Страница 96: ...H 525 Qrgtcvkqp Ockpvgpcpeg cpf Kpuvtwevkqpu Ocpwcn C0 CSA Canadian Standards Association...
Страница 97: ...Egtvkhkecvkqpu Kphqtocvkqp C0...
Страница 98: ...H 525 Qrgtcvkqp Ockpvgpcpeg cpf Kpuvtwevkqpu Ocpwcn C032...
Страница 114: ...6 Mounting Instructions...