Installation Flowchart
VI
Installation Flowchart
START
NOTE
Get the best results of the FRI303
by carefully reading this manual.
Install FRI303 according to the best
practices in the field. Check the
best position for Liquid Crystal
Display (LCD) (Section 1)
Check the area classification and
follow the best practices (Section 1)
Has the FRI303
powered up and was the
LCD configured?
NO
YES
Follow the maintenance procedures (Section 4) Check:
- power supply and the polarity;
- electronic circuit.
Is the communication ok?
Follow the maintenance procedures (Section 4) Check:
- network connections;
- network impedance;
- controller configuration;
- network configuration;
- electronic circuit;
- physical address.
NO
Power up the FRI303 properly.
YES
YES
Are the outputs ok?
Follow the maintenance procedures (Section 4) Check:
- terminals connections;
- switching current;
- voltage for outputs;
- output fuse;
- if the output type (NO, NC) is according to the ordering
code.
NO
*More information in Section 1 of
FRI303
. Operation, Maintenance and Instructions Manual.
Содержание FRI303
Страница 1: ......
Страница 2: ......
Страница 14: ...FRI303 Operation and Maintenance Instruction Manual 1 8 Figure 1 11 Bus Topology Figure 1 12 Tree Topology ...
Страница 16: ...FRI303 Operation and Maintenance Instruction Manual 1 10 ...
Страница 34: ...FRI303 Operation and Maintenance Instruction Manual 5 4 ...