5 Installation Requirements
For safe operation of the inverter, the installation site must satisfy the following
conditions:
•
Foundation (load carrying capacity)
•
Inverter protection rating / EMC / sound levels
•
Minimum workspace requirements (escape routes)
•
Ventilation / permissible ambient temperature / air quality / humidity
5.1 Installation Site Requirements
5.1.1 Foundation
The foundation must guarantee solid and safe positioning of the inverter. It must provide
the load-carrying capacity necessary to cope with the weight of the inverter. A
foundation slab is required for ground-mounted installations. Pouring and dimensioning
the foundation slab must be performed by the customer, see
Appendix D
.
Figure 5.1:
Installation of the SC100 Indoor in a building
ventilation system (option customer)
Cable section (option customer)
Cable section (option customer)