Operation and Maintenance Manual-
Doda HD35 – Slurry Centrifugal Pump
15
5. First cut the shield (Fig 2.3) and use the off cut part as a reference to cut the
splined shaft (Fig 2.4).
6. Proceed in the same way for the second half.
7. Trim and chamfer the two cut ends of the PTO and clean off all swarf and
shavings (Fig 2.5).
Fig 2.3 – Cutting the Guard Fig 2.4 – Cutting the Shaft Fig 2.5 – Chamfering
Cleaning
8. Grease the two profiles and join the two halves of the PTO together.
9. Mount the PTO shaft and check that its length is correct as before.
The shaft must not reach the end of the tube or project from this.
Содержание Doda HD35
Страница 1: ...Operation and Maintenance Manual Doda Slurry Centrifugal Pump...
Страница 5: ...Operation and Maintenance Manual Doda HD35 Slurry Centrifugal Pump 5 Doda HD35 Pump General Dimensions...
Страница 11: ...Operation and Maintenance Manual Doda HD35 Slurry Centrifugal Pump 11...
Страница 12: ...Operation and Maintenance Manual Doda HD35 Slurry Centrifugal Pump 12 Grease Points...
Страница 29: ...Operation and Maintenance Manual Doda HD35 Slurry Centrifugal Pump 29...
Страница 30: ...Operation and Maintenance Manual Doda HD35 Slurry Centrifugal Pump 30...
Страница 31: ...Operation and Maintenance Manual Doda HD35 Slurry Centrifugal Pump 31...
Страница 32: ...Operation and Maintenance Manual Doda HD35 Slurry Centrifugal Pump 32...
Страница 33: ...Operation and Maintenance Manual Doda HD35 Slurry Centrifugal Pump 33...
Страница 34: ...Operation and Maintenance Manual Doda HD35 Slurry Centrifugal Pump 34...