Sleipner SEP-IP60 Скачать руководство пользователя страница 12

12

4354

11

2021

-

SEP IP 60

MG_0005

R

D

1

2

3

4

6

5

8 x layers of fiberglass 

and resin

8 x layers of fiberglass 

and resin

MG_0006

R = D x 0,1

R = D x 0,1

D x

 0,1

-0,1

5

D x

 0,1

-0,

15

D

Layers of 

fiberglass 

and resin

Layers of 

fiberglass 

and resin

*Fiberglass 

Hull

*Steel/ 

Aluminium 

Hull

Hull

Hull

Hull

Tunnel

Tunnel

Tunnel

Welding

Layers of 

fiberglass 

and resin

Additional Layers of 

fiberglass and resin

Additional Layers of 

fiberglass and resin

Hull

1

3

4

2

IMPORTANT 

Avoid all casting where the motor-bracket is to be placed, as this will cause misfi t and possible failure to the gear house.

Tunnel Installation

EN

With tunnel installed and cast.

1.  Round the edges with a radius of 10% of the tunnel diameter. 

2.  For steel/ aluminium hulls make a slope with a length of 10-15% of the tunnel diameter. 

(NB: If this is not possible, round the tunnel end as much as possible.)

3.  Additionally cast two layers on the outside of the tunnel/ hull in a 10cm area

4.  Follow the same method if making the deflector/ spoiler.

You must apply gel coat to areas you have grounded/ moulded to make waterproof. These areas allow water access to the hull which is typically not 

waterproof without these applications outside. 

(NB: All original Side-Power tunnels are fully waterproof when delivered except in the areas where 

you have cut and bonded it to the hull.)

MC_0003

Содержание SEP-IP60

Страница 1: ...SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Pro Ignition Protected DC Thruster Models SEP IP60 EN I M 4354 11 2021...

Страница 2: ...ns 5 Technical Specifications 5 Positioning of the tunnel thruster 6 Tunnel Length 7 Tunnel installation in sailboats 8 Water Deflection 9 Tunnel ends 10 Tunnel installation 11 12 Stern tunnel install...

Страница 3: ...dance with their local outlined regulations classi cation rules Before installation it is important that the installer reads this guide to ensure necessary acquaintance with the product The recommenda...

Страница 4: ...D Water Depth 185 7 28 185 7 28 TL Minimum tunnel length 128 5 04 128 5 04 TL recommended Recommended tunnel length 165 6 50 165 6 50 T min Minimum tunnel wall thickness 4 0 16 4 0 16 T max Maximum tu...

Страница 5: ...vice protects against sudden change of drive direction The electric thermal cut off switch in electro motor protects against overheating auto reset when electro motor cools down Flexible coupling betw...

Страница 6: ...deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during ope...

Страница 7: ...low the variable length of the tunnel walls to vary in length excessively EG the top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the wate...

Страница 8: ...t the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster in...

Страница 9: ...angled slightly down because of the water flow on this area 2 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler will...

Страница 10: ...el and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angled...

Страница 11: ...r the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass to t...

Страница 12: ...l installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible roun...

Страница 13: ...tion please refer to the supplied manual in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Ins...

Страница 14: ...dance with their local outlined regulations classi cation rules Before installation it is important that the installer reads this guide to ensure necessary acquaintance with the product The recommenda...

Страница 15: ...ely with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and prope...

Страница 16: ...Insert the washer to the end of the shaft spline Tighten with the propeller lock nut 3 Apply anti fouling to the gear leg and propeller Do not apply anti fouling to any rubber elements of the gear le...

Страница 17: ...rts on the motors top cap 4 Fasten the bolts holding the motor to the motor bracket with the above torque 5 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can...

Страница 18: ...from the rest of the electrical operation of the vessel when not on board or in emergencies NB It is advised to install a fuse on the positive cable for protection against short circuiting of the main...

Страница 19: ...NA AWG 2 0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0 2...

Страница 20: ...B black red B B 05M 05M 5A 12 24 5A 12 24 PPC PJC 212 Proportional joystick control panel Bow and stern Station 1 S PJC 212 Observe PPC battery terminal polarity S S 12 24V 5A S link on off switch red...

Страница 21: ...as short as practically possible POWER Cable Must be one in each system length 2 5m 4 Port T Connector The 4 port T connector allows multiple spur cables to be connected NB Comes with two sealing caps...

Страница 22: ...22 4354 11 2021 SEP IP 60 MG_0062 Technical Wiring Diagram EN...

Страница 23: ...EN For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REV...

Страница 24: ...r house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightened...

Страница 25: ...the Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding that for...

Страница 26: ...26 4354 11 2021 SEP IP 60 MC_0037 Notes EN...

Страница 27: ...27 4354 11 2021 SEP IP 60 MC_0037 Notes EN...

Страница 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Motor AS can not accept liability for any possible differen...

Отзывы: