Sleipner SEP-IP100 Скачать руководство пользователя страница 5

 5

2705

12

2022

-

SEP IP 100 & SEP IP 130

MC_0132

Product Measurements 

Measurement 

code

Measurement description

mm inch mm inch mm inch mm inch

ID

Internal tunnel diameter

185

7,28

185

7,28

250

9,84

250

9,84

H

Motor Height

499

19,65

510

20,08

511

20,12

511

20,12

W

Width

306

12,05

306

12,05

306

12,05

306

12,05

L

Length

381

15,00

381

15,00

381

15,00

381

15,00

WD

Water Depth

185

7,28

185

7,28

250

9,84

250

9,84

TL

Minimum tunnel length

158

6,22

158

6,22

253

9,96

253

9,96

TL (recommended)

Recommended tunnel length

195

7,68

216

8,50

303

11,93

303

11,93

T (min)

 Minimum tunnel wall thickness

6

0,24

6

0,24

6

0,24

6

0,24

T (max)

Maximum tunnel wall thickness

8

0,31

8

0,31

8

0,31

8

0,31

                  

SE IP 100

12v

SE IP 100

24v

SE IP 130

12v

SE IP 130

24v

*Valid for SE IP & SEP IP

MG_0076

H

W

L

TL

WD

ID

T

Tunnel centre line

Twin Propeller

Propeller position will 

vary with each thruster 

model

The gear leg/ propeller(s) must 

never extend out of the tunnel 

MC_0138

Product Specifi cations 

* SE and SE-IP are measured at motor terminals when the thruster is operated for on/off thrusters

** SEP and SEP-IP are measured at PPC supply terminals for proportional thrusters 

Product

Maximum Operating Power *

Maximum supply voltage **

Thrust at 

12V or 24V

Thrust at 

10.5V

(12V)

 or 21V

(24V)   

Power 

(kw / Hp)

Weight 

(kg / lbs)

Maximum 

Operation Time

SE 80

12V

96 kg / 212 lbs

80 kg / 176 lbs

4.4kw / 6hp

20kg / 44lbs

S2 motor at 

2 - 3 min. 

Duty cycle at 20°c 

(Ambient temperature)

24V

96 kg / 212 lbs

80 kg / 176 lbs

4.4kw / 6hp

20kg / 44lbs

SE 100

12V

116 kg / 256 lbs

100 kg / 220 lbs

6.3kw / 8.4hp

31kg / 68lbs

24V

116 kg / 256 lbs

100 kg / 220 lbs

6.3kw / 8.4hp

31kg / 68lbs

SE 120

24V

139 kg / 306 lbs

120 kg / 264 lbs

6.4kw / 8.55hp

34kg / 74lbs

SE 130

12V

160 kg / 352 lbs

130 kg / 284 lbs

6.5kw / 8.7hp

37kg / 77lbs

24V

160 kg / 352 lbs

130 kg / 284 lbs

6.5kw / 8.7hp

37kg / 77lbs

SE 150

24V

182 kg / 400 lbs

150 kg / 330 lbs

8.8kw / 11.8hp

38kg / 79lbs

                  

MC_0055

Proportional Technical Specifi cations

Safety features:

      - The PPC Speed Control unit will turn off motor power each time the main solenoids are activated. This removes any possibility for  

 

 

  solenoid lock-in. Any fault in the main solenoids will give feedback to the panel and turn off power to the electric motor.

  

 

 

Содержание SEP-IP100

Страница 1: ...MOTOR AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Pro Ignition Protected DC Thruster Models SEP IP100 SEP IP130 EN I M 2705...

Страница 2: ...ct Specifications 5 Proportional Technical Specifications 5 Positioning of the tunnel thruster 6 Tunnel Length 7 Tunnel installation in sail boats 8 Water Deflection 9 Tunnel ends 10 Tunnel installati...

Страница 3: ...ge compartments must be separated from the thruster to prevent nearby items becoming dusty dirty NB IP version motors generate dust but are enclosed MC_0425 For thruster systems Do not install the thr...

Страница 4: ...Depth 185 7 28 185 7 28 250 9 84 250 9 84 TL Minimum tunnel length 158 6 22 158 6 22 253 9 96 253 9 96 TL recommended Recommended tunnel length 195 7 68 216 8 50 303 11 93 303 11 93 T min Minimum tun...

Страница 5: ...212 lbs 80 kg 176 lbs 4 4kw 6hp 20kg 44lbs SE 100 12V 116 kg 256 lbs 100 kg 220 lbs 6 3kw 8 4hp 31kg 68lbs 24V 116 kg 256 lbs 100 kg 220 lbs 6 3kw 8 4hp 31kg 68lbs SE 120 24V 139 kg 306 lbs 120 kg 264...

Страница 6: ...r as deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during...

Страница 7: ...ength of the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereb...

Страница 8: ...stead fit the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thru...

Страница 9: ...tunnel entry The depth and shape of this recess will depend on the boat and the angle facing up down aft of the tunnel insert Normally it is angled slightly down because of the water flow on this are...

Страница 10: ...tunnel and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls an...

Страница 11: ...over the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply fibreglass NB Do not cast or add breglass...

Страница 12: ...tunnel installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible...

Страница 13: ...manual in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For DC Electric T...

Страница 14: ...leg to ensure it is centred and rotates freely with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the c...

Страница 15: ...end of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of the propeller and tighten the anode holding screw Apply a thread glue Loctite 243 or similar to ensure tha...

Страница 16: ...ctly top and bottom NB The motor can be placed in all directions on the motor bracket However ensure the cable terminals are accessible for electrical installation later 6 If you are installing the mo...

Страница 17: ...ation Nominal current drawn is listed in the Cross Section Guide for Power Cables chapter The actual voltage at the motor while running the thruster determines the motor RPM and thrust Use larger cabl...

Страница 18: ...0 NA NA NA AWG 2 0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4...

Страница 19: ...ed for detailed installation instructions See S Link System Description chapter for detailed information on installation of S Link Power cable and additional S Link components Selection of battery fus...

Страница 20: ...ed wire connected to 12VDC or 24VDC To reduce the risk of interference avoid routing the S Link cables close to equipment such as radio transmitters antennas or high voltage cables The backbone must b...

Страница 21: ...Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed MC_0398 Control Panel SLEIPNER MOTOR AS P O Box 519 N 1612 Fredrikstad Norway www slei...

Страница 22: ...gear house and propeller but NOT anodes sealing rubber fittings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tigh...

Страница 23: ...stances of the defect to the best of the Claimant s knowledge including product identification and serial nbr the date and place of purchase and the name and address of the installer Proof of purchase...

Страница 24: ...curacies or omissions it may contain Continuous product improvement may change the product specifications without notice Therefore Sleipner Group cannot accept liability for any possible differences b...

Отзывы: