Sleipner SEP-IP100 Скачать руководство пользователя страница 2

2

2705

12

2022

-

SEP IP 100 & SEP IP 130

Sleipner Motor AS

P.O. Box 519, Arne Svendsensgt. 6-8

N-1612 Fredrikstad, Norway 

MC_0020

Contents

Products 

SEP130/250T-24IP - SEP130 Tunnel thruster, 24v 

SEP100/185T-12IP - SEP100 Tunnel thruster, 12V-IP 

SEP130/250T-12IP - SEP130 Tunnel thruster, 12V-IP 

When installing an S-Link™ system DO NOT connect any other control equipment directly to the S-Link™ bus except original Sleipner S-Link™ products. 

In case of connecting third-party equipment, it must always be connected through a Sleipner-supplied interface product. 

Any attempt to directly control or connect into the S-Link™ control system without a designated and approved interface will render all warranties and 

responsibilities of all of the connected Sleipner products. 

If you are interfacing the S-Link™ bus by agreement with Sleipner through a designated Sleipner supplied interface, you are still required to install at 

least one original Sleipner control panel to enable efficient troubleshooting if necessary.

MC_0105

MC_0031

For electric motor thrusters

•  The thruster must NOT be installed in compartments that require ignition proof electric equipment. If necessary, make a separate compartment. 
 

(NB: Ignition Protected systems are tested to be installed in areas with possible explosive gases in accordance with ISO 8846)

•  When installing the thruster electric motor in small compartments, ensure the compartment is well ventilated to allow for cooling of the electro  

 motor.

•  If the height of the room you are installing the thruster is limited, the thruster can be installed horizontally or at any angle in-between. 

    -    If the electro motor is positioned more than 30 degrees off vertical, it must be supported separately.

    -    Beware of keeping installation within advised measurements. No part of the propeller or gear house must be outside the tunnel.

•  The electric motor, components and cables must be mounted so they remain dry at all times.

•  Do not fi nish the inside of the tunnel with a layer of gel-coat/ topcoat or similar. There is only room for a thin coat of primer and two layers of anti- 

  fouling between the tunnel and the props.

•  Don’t install the electric motor close to easily flammable objects or equipment as it will reach over 100°C before the temperature switch is   

 activated.

•  Do not store items close to the thruster motor. Any loose items near the thruster motor is a potential fi re hazard and can cause undesired short-   

 circuiting.

•  Do not lift it by internal cable connections, main terminals.

•  The thruster power supply circuit must include the recommended sized fuse and a battery isolation switch.

•  The electric/ hydraulic motor must be handled with care. Do not rest the thruster motor on its drive shaft as its weight can damage the shaft.

MC_0425

For thruster systems

•  Do not install the thruster in a position where you need to cut a stiffener/ stringer/ support that may jeopardise the hull integrity without checking  

  with the boat builder this can be done safely.

•  We advise painting the gear house and propellers with anti-fouling. 

(NB: Do not paint the anodes, sealing, rubber fi ttings or propeller shafts)

•  There is only room for a thin coat of primer and two layers of anti-fouling between the tunnel and the props.

•  Never run the thruster out of water.

MC_0502

Lithium Batteries for proportional thrusters models SEP, SEP-IP and eVision

•  If a lithium battery system is installed for supply of SEP, SEP-IP or eVision thrusters, make sure the battery is designed for continuous supply of the  

  required thruster current. Under-rated battery management system can suddenly disconnect the load which may lead to dangerous situations. The    

    fi rmware version of Proportional Power Controller (PPC) must be of version 1.033 or later if the PPC is to be connected to a lithium battery.   

  Operating the thruster outside specifi ed ratings will void warranty.

Installation Manual 

Responsibility of the installer ..................................................................................................................................................................... 3

General Installation Considerations and Precautions Guidelines ............................................................................................................ 3

 

Product Measurements   ............................................................................................................................................................................ 4 

Product Specifications

 ................................................................................................................................................................................ 5

Proportional Technical Specifications

 ........................................................................................................................................................ 5

 

Positioning of the tunnel / thruster

 ............................................................................................................................................................ 6 

Tunnel Length ............................................................................................................................................................................................. 7 

Tunnel installation in sail boats .................................................................................................................................................................. 8 

Water Deflection ......................................................................................................................................................................................... 9 

Tunnel ends .............................................................................................................................................................................................  10 

Tunnel installation ............................................................................................................................................................................ 11 - 12 

Stern tunnel installation ..........................................................................................................................................................................  13 

Gear Leg & Motor Bracket Installation ....................................................................................................................................................  14 

Propeller Installation ...............................................................................................................................................................................  15 

Motor Installation ....................................................................................................................................................................................  16 

Electrical Installation ..............................................................................................................................................................................  17 

Product Lug Connection Configuration 

 ..................................................................................................................................................  17

Electrical Reference Guide ....................................................................................................................................................................... 18

Visual Wiring Diagram  .............................................................................................................................................................................  19

S-Link System Description ....................................................................................................................................................................... 20

Control Panel Installation  .......................................................................................................................................................................  21 

 

Pre-delivery Checklist  ...........................................................................................................................................................  22

 

Service and Support ...............................................................................................................................................................  23

Product Spare Parts and Additional Resources .......................................................................................................................  23

Warranty Statement ...............................................................................................................................................................  23

Содержание SEP-IP100

Страница 1: ...MOTOR AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Pro Ignition Protected DC Thruster Models SEP IP100 SEP IP130 EN I M 2705...

Страница 2: ...ct Specifications 5 Proportional Technical Specifications 5 Positioning of the tunnel thruster 6 Tunnel Length 7 Tunnel installation in sail boats 8 Water Deflection 9 Tunnel ends 10 Tunnel installati...

Страница 3: ...ge compartments must be separated from the thruster to prevent nearby items becoming dusty dirty NB IP version motors generate dust but are enclosed MC_0425 For thruster systems Do not install the thr...

Страница 4: ...Depth 185 7 28 185 7 28 250 9 84 250 9 84 TL Minimum tunnel length 158 6 22 158 6 22 253 9 96 253 9 96 TL recommended Recommended tunnel length 195 7 68 216 8 50 303 11 93 303 11 93 T min Minimum tun...

Страница 5: ...212 lbs 80 kg 176 lbs 4 4kw 6hp 20kg 44lbs SE 100 12V 116 kg 256 lbs 100 kg 220 lbs 6 3kw 8 4hp 31kg 68lbs 24V 116 kg 256 lbs 100 kg 220 lbs 6 3kw 8 4hp 31kg 68lbs SE 120 24V 139 kg 306 lbs 120 kg 264...

Страница 6: ...r as deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during...

Страница 7: ...ength of the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereb...

Страница 8: ...stead fit the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thru...

Страница 9: ...tunnel entry The depth and shape of this recess will depend on the boat and the angle facing up down aft of the tunnel insert Normally it is angled slightly down because of the water flow on this are...

Страница 10: ...tunnel and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls an...

Страница 11: ...over the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply fibreglass NB Do not cast or add breglass...

Страница 12: ...tunnel installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible...

Страница 13: ...manual in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For DC Electric T...

Страница 14: ...leg to ensure it is centred and rotates freely with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the c...

Страница 15: ...end of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of the propeller and tighten the anode holding screw Apply a thread glue Loctite 243 or similar to ensure tha...

Страница 16: ...ctly top and bottom NB The motor can be placed in all directions on the motor bracket However ensure the cable terminals are accessible for electrical installation later 6 If you are installing the mo...

Страница 17: ...ation Nominal current drawn is listed in the Cross Section Guide for Power Cables chapter The actual voltage at the motor while running the thruster determines the motor RPM and thrust Use larger cabl...

Страница 18: ...0 NA NA NA AWG 2 0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4...

Страница 19: ...ed for detailed installation instructions See S Link System Description chapter for detailed information on installation of S Link Power cable and additional S Link components Selection of battery fus...

Страница 20: ...ed wire connected to 12VDC or 24VDC To reduce the risk of interference avoid routing the S Link cables close to equipment such as radio transmitters antennas or high voltage cables The backbone must b...

Страница 21: ...Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed MC_0398 Control Panel SLEIPNER MOTOR AS P O Box 519 N 1612 Fredrikstad Norway www slei...

Страница 22: ...gear house and propeller but NOT anodes sealing rubber fittings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tigh...

Страница 23: ...stances of the defect to the best of the Claimant s knowledge including product identification and serial nbr the date and place of purchase and the name and address of the installer Proof of purchase...

Страница 24: ...curacies or omissions it may contain Continuous product improvement may change the product specifications without notice Therefore Sleipner Group cannot accept liability for any possible differences b...

Отзывы: