Sleipner SE-IP60 Скачать руководство пользователя страница 21

 21

5897

14

2022

-

SE IP 60 s2

MG_0067

 

 

6 1265

 5-LEAD 

Y-CONNECTOR

6 1265

 5-LEAD 

Y-CONNECTOR

6 1278-xxM

 5-LEAD 

CONTROL CABLE

6 1278-xxM

 5-LEAD 

CONTROL CABLE

6 1278-xxM

 5-LEAD 

CONTROL CABLE

6 1277-xxM

 4-LEAD 

CONTROL CABLE

6 1277-xxM

 4-LEAD 

CONTROL CABLE

STERN

BOW

STERN

BOW

STERN

6 1278-xxM

 5-LEAD 

CONTROL CABLE

Switch

5A fuse

Switch

5A fuse

 

 Common negative

10A fuse

+

-

+

-

6 1274

 4-LEAD 

Y-CONNECTOR

STERN

BOW

STERN

BOW

STERN

xA fuse

6 1277-xxM

 4-LEAD 

CONTROL CABLE

6 1277-xxM

 4-LEAD 

CONTROL CABLE

6 1277-xxM

 4-LEAD 

CONTROL CABLE

6 1277-xxM

 4-LEAD 

CONTROL CABLE

6 1274

 4-LEAD 

Y-CONNECTOR

xA fuse

 

 Common negative

10A fuse

+

+

-

-

With Automatic Main Switch:

With Manual Main Switch:

Visual Wiring Diagram

IMPORTANT

Check the following with the main switch in the off position  

After all electrical connections have been completed check with an ohm meter that there is no electrical connection between electro motor body and 

positive terminal on the motor and between the electro motor body and the negative (A1) terminal on the motor. If you feel unsure about how to 

perform this check, contact skilled personnel for guidance

Common negative MUST be wired when using control panel 8940 and 8909C if separate battery banks are installed. (Bow and Stern thrusters 

combined)

To define appropriate (-) cable and 

fuse size contact a skilled electrician

To define appropriate (-) cable and 

fuse size contact a skilled electrician

MG_0025

Thruster

Motor

Connect round end 

of control adapter 

1

2

3

4

2

1

3

4

Pin 4

Pin 3

Pin 2

Pin 4

Pin 3

Pin 2

Содержание SE-IP60

Страница 1: ...EIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Ignition Protected DC Electric Thruster Models SE IP60 EN I M 5897 14 20...

Страница 2: ...ng of the tunnel thruster 6 Tunnel Length 7 Tunnel installation in sail boats 8 Water Deflection 9 Tunnel ends 10 Tunnel installation 11 12 Stern tunnel installation 13 Gear Leg Motor Bracket Installa...

Страница 3: ...zed fuse and a battery isolation switch The installer must read this document to ensure necessary familiarity with the product before installation Instructions in this document cannot be guaranteed to...

Страница 4: ...D Water Depth 185 7 28 TL Minimum tunnel length 128 5 04 TL recommended Recommended tunnel length 165 6 50 T min Minimum tunnel wall thickness 4 0 16 T max Maximum tunnel wall thickness 6 0 24 IP 60 s...

Страница 5: ...evice protects against sudden change of drive direction The electric thermal cut off switch in electro motor protects against overheating auto reset when electro motor cools down Flexible coupling bet...

Страница 6: ...deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during ope...

Страница 7: ...of the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereby the...

Страница 8: ...t the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster in...

Страница 9: ...angled slightly down because of the water flow on this area 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler will...

Страница 10: ...l and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angled t...

Страница 11: ...the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass to th...

Страница 12: ...l installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible roun...

Страница 13: ...al in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For DC Electric Thrust...

Страница 14: ...ly with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and propel...

Страница 15: ...the propeller until the drive pin aligns with the internal slot in the propeller 2 Insert the washer to the end of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of...

Страница 16: ...ts on the motors top cap 4 Fasten the bolts holding the motor to the motor bracket with the above torque 5 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can b...

Страница 17: ...i c duty cycle 2 Use appropriate sized cables and batteries with high cranking capacity to feed the thruster The actual voltage at the motor while running the thruster decides the motors output RPM an...

Страница 18: ...0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0 2 x 3 0 100...

Страница 19: ...Fuse Battery main switch 1 5 4 2 6 8 9 red grey sig blue sig black red grey sig blue sig brown 3 red Fused inside 1A black 7 white NB Make sure to not use any electronic interface box delay box older...

Страница 20: ...the same time in opposite directions the electronic control box will stop the thruster until it receives a single signal or thrust in one direction Sleipner on off equipment it is entirely plug play...

Страница 21: ...egative 10A fuse With Automatic Main Switch With Manual Main Switch Visual Wiring Diagram IMPORTANT Check the following with the main switch in the off position After all electrical connections have b...

Страница 22: ...on For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVI...

Страница 23: ...house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightened...

Страница 24: ...f the defect to the best of the Claimant s knowledge including product identi cation and serial nbr the date and place of purchase and the name and address of the installer Proof of purchase date shou...

Страница 25: ...25 5897 14 2022 SE IP 60 s2 MC_0037 Notes...

Страница 26: ...26 5897 14 2022 SE IP 60 s2 MC_0037 Notes...

Страница 27: ...27 5897 14 2022 SE IP 60 s2 MC_0037 Notes...

Страница 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Group cannot accept liability for any possible differences...

Отзывы: