Sleipner SE-IP60 Скачать руководство пользователя страница 13

 13

5897

14

2022

-

SE IP 60 s2

For

 Stern Thruster

 installation please refer to the supplied manual in your Sleipner product delivery

Stern Thruster  

SLEIPNER AS

P.O. Box 519
N-1612  Fredrikstad
Norway
www.sleipnergroup.com

DOCUMENT ID:

REVISION:

DATE:

LANGUAGE:

Installation Guide

For DC Electric

 

Thruster Models

SE80, SE100, SE120, SE130, SE150

EN

I M

222222
1
2018

Stern Tunnel Installation

MC_0003

MG_0005

R

D

1

2

3

4

6

5

8 x layers of fiberglass 

and resin

8 x layers of fiberglass 

and resin

MG_0006

R = D x 0,1

R = D x 0,1

D x

 0,1

-0,1

5

D x

 0,1

-0,

15

D

Layers of 

fiberglass 

and resin

Layers of 

fiberglass 

and resin

*Fiberglass 

Hull

*Steel/ 

Aluminium 

Hull

Hull

Hull

Hull

Tunnel

Tunnel

Tunnel

Welding

Layers of 

fiberglass 

and resin

Additional Layers of 

fiberglass and resin

Additional Layers of 

fiberglass and resin

Hull

1

3

4

2

IMPORTANT 

Avoid all casting where the motor-bracket is to be placed, as this will cause misfi t and possible failure to the gear house.

Tunnel Installation

With tunnel installed and cast.

1.  Round the edges with a radius of 10% of the tunnel diameter. 

2.  For steel/ aluminium hulls make a slope with a length of 10-15% of the tunnel diameter. 

(NB: If this is not possible, round the tunnel end as much as possible.)

3.  Additionally cast two layers on the outside of the tunnel/ hull in a 10cm area

4.  Follow the same method if making the deflector/ spoiler.

You must apply gel coat to areas you have grounded/ moulded to make waterproof. These areas allow water access to the hull which is typically not 

waterproof without these applications outside. 

(NB: All original Side-Power tunnels are fully waterproof when delivered except in the areas where 

you have cut and bonded it to the hull.)

MC_0003

Содержание SE-IP60

Страница 1: ...EIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Ignition Protected DC Electric Thruster Models SE IP60 EN I M 5897 14 20...

Страница 2: ...ng of the tunnel thruster 6 Tunnel Length 7 Tunnel installation in sail boats 8 Water Deflection 9 Tunnel ends 10 Tunnel installation 11 12 Stern tunnel installation 13 Gear Leg Motor Bracket Installa...

Страница 3: ...zed fuse and a battery isolation switch The installer must read this document to ensure necessary familiarity with the product before installation Instructions in this document cannot be guaranteed to...

Страница 4: ...D Water Depth 185 7 28 TL Minimum tunnel length 128 5 04 TL recommended Recommended tunnel length 165 6 50 T min Minimum tunnel wall thickness 4 0 16 T max Maximum tunnel wall thickness 6 0 24 IP 60 s...

Страница 5: ...evice protects against sudden change of drive direction The electric thermal cut off switch in electro motor protects against overheating auto reset when electro motor cools down Flexible coupling bet...

Страница 6: ...deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during ope...

Страница 7: ...of the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereby the...

Страница 8: ...t the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster in...

Страница 9: ...angled slightly down because of the water flow on this area 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler will...

Страница 10: ...l and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angled t...

Страница 11: ...the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass to th...

Страница 12: ...l installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible roun...

Страница 13: ...al in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For DC Electric Thrust...

Страница 14: ...ly with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and propel...

Страница 15: ...the propeller until the drive pin aligns with the internal slot in the propeller 2 Insert the washer to the end of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of...

Страница 16: ...ts on the motors top cap 4 Fasten the bolts holding the motor to the motor bracket with the above torque 5 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can b...

Страница 17: ...i c duty cycle 2 Use appropriate sized cables and batteries with high cranking capacity to feed the thruster The actual voltage at the motor while running the thruster decides the motors output RPM an...

Страница 18: ...0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0 2 x 3 0 100...

Страница 19: ...Fuse Battery main switch 1 5 4 2 6 8 9 red grey sig blue sig black red grey sig blue sig brown 3 red Fused inside 1A black 7 white NB Make sure to not use any electronic interface box delay box older...

Страница 20: ...the same time in opposite directions the electronic control box will stop the thruster until it receives a single signal or thrust in one direction Sleipner on off equipment it is entirely plug play...

Страница 21: ...egative 10A fuse With Automatic Main Switch With Manual Main Switch Visual Wiring Diagram IMPORTANT Check the following with the main switch in the off position After all electrical connections have b...

Страница 22: ...on For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVI...

Страница 23: ...house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightened...

Страница 24: ...f the defect to the best of the Claimant s knowledge including product identi cation and serial nbr the date and place of purchase and the name and address of the installer Proof of purchase date shou...

Страница 25: ...25 5897 14 2022 SE IP 60 s2 MC_0037 Notes...

Страница 26: ...26 5897 14 2022 SE IP 60 s2 MC_0037 Notes...

Страница 27: ...27 5897 14 2022 SE IP 60 s2 MC_0037 Notes...

Страница 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Group cannot accept liability for any possible differences...

Отзывы: