
10
6399
11
2021
-
HydroPOD 35 & 50
MG_0112
Align two ends of the tunnel.
Remove cover guard.
Remove cover
guard.
Remove cover
guard.
Push two tunnel
ends together.
Check snap lock
positions around the
tunnel.
Snap lock
Ensure top lips tabs
into the motor
inserts.
1
2
Tunnel Installation
1. Ensure to remove the plastic cover guard on the tunnel.
2. Connect both ends of the tunnel to the thruster motor. All hooks must be completely interlocked making the inside of the tunnel smooth.
(NB:
Ensure tunnel moulding around the gear leg and tunnel top align.)
MC_0074
!
Please refer to the graphic for special considerations relating to your model
!
IMPORTANT
Ensure all snap-lock positions are correctly connected into place.
Содержание Pro DC External POD
Страница 23: ...23 6399 11 2021 HydroPOD 35 50 MC_0037 Notes...