S-Link System Description

S-Link is a CAN-based control system used for communication between Sleipner products installed on a vessel. The system uses BACKBONE Cables 

as a common power and communication bus with separate SPUR Cables to each connected unit. Units with low power consumption are powered 

directly from the S-Link bus therefore one power cable must be connected to the BACKBONE Cable through a T-Connector. 

 

Main advantages of S-Link system:

-    Compact and waterproof plugs.

-    BACKBONE and SPUR Cables have different colour coding and keying to ensure correct and easy installation. BACKBONE Cables have blue  

  connectors and SPUR Cables have green connectors.

-    Different cable lengths and BACKBONE Extenders makes the system scalable and flexible to install. 

Installation of S-Link cables:

Select appropriate cables to keep the length of BACKBONE- and SPUR Cables to a minimum. In case of planned installation with total BACKBONE 

Cable length exceeding 100 meters please consult your local distributor. The S-Link cables should be installed to ensure sharp bend radius’s is 

avoided. Locking mechanism on connectors must be fully closed. To ensure long lifetime, cables, T-Connectors and Extenders should not be 

located so that they are permanently immersed in water or other fluids. It is also recommended to install cables such that water and condensation do 

not run along the cables and into the connectors.

The POWER Cable should ideally be connected around the middle of the BACKBONE Cable to ensure an equal voltage drop at each end of the 

BACKBONE Cable. The yellow and black wire in the POWER Cable shall be connected to GND and the red wire connected to +12VDC or +24VDC.

To reduce the risk of interference, avoid routing the S-Link cables close to equipment such as radio transmitters, antennas or high voltage cables. The 

backbone must be terminated at each end with the END Terminator.

SPUR cables can be left unterminated to prepare for the installation of future additional equipment. In such cases, ensure to protect open connectors 

from water and moisture to avoid corrosion in the connectors.

MG_0159

BACKBONE Cable

Forms the communication and power bus throughout 

a vessel. Available in different standard lengths.

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Blue ends

*Green ends

*Green ends

*Green ends

*Green ends

*Green ends

SPUR Cable

Used to connect S-Link compliant products to the 

backbone cable. One SPUR Cable must be used for 

each connected component, with no exceptions. 

Recommended to be as short as practically possible. 

Available in different standard lengths.

POWER Cable

Required in all installations for connection of BACKBONE 

Cable to a power supply. It shall not be more than one 

POWER Cable in an installation.

4-Port T-Connector

The 4-PORT T-connector allows multiple SPUR Cables to be 

connected. The 4-PORT T-connector comes with two sealing 

caps to protect unused ports.

T-Connector

Used for connection of SPUR 

or POWER Cable to the 

BACKBONE Cable. One 

T-Connector for each 

connected cable.

BACKBONE Extender

Connects two BACKBONE 

Cables to extend the length. 

END Terminator

Must be one at each end of 

the BACKBONE bus. 

+12/24V

GND

Optional 

ON/OFF Switch

 Fuse 2A

S-Link installation example

Spur

Power

T-Connector

End 

Terminator

End 

Terminator

Backbone Extender

Bow Thruster

Control Panel

Backbone

Backbone

Backbone

Spur

*For DC system

Spur

4 Port T-Connector

4 Port T-Connector

Stern Thruster

Automatic 

Main switch

S-Link

Power 

Supply

yellow

red

black

MG_0331

ESI-1

Controller

Breaker/Fuse 5A

+24V

0V

Power supply

Cable #6 1328

Terminator

#6 1327

R

ed

Y

ell

ow

B

la

ck

RO2-Feedback

Run Enable

RO1-Feedback

Thrust Enable

RO2A

RO2C

RO1A

RO1C

DI1

Thrust Enable

+24V

DI1

DI_GND

AI2

Stern Thrust

AI1

Bow Thrust

Loop Supply

4-20mA

+

-

Loop Supply

4-20mA

+

-

Loop Supply

4-20mA

+

-

Loop Supply

4-20mA

+

-

AI2-

AI2+

AI1-

AI1+

DRAWING

DRAWING

DRAWN BY

SFD

DRAWN BY

SFD

REVISED DATE

06.09.2018

REVISED DATE

06.09.2018

PAGE

2 OF 2

PAGE

2 OF 2

TITLE

ESI-1 Connection Diagram

TITLE

ESI-1 Connection Diagram

REVISION

2

REVISION

2

DRAWN DATE

06-Sep-18

DRAWN DATE

06-Sep-18

APPROVED BY

APPROVED BY

APPROVED DATE

0

APPROVED DATE

0

Sleipner Motor AS

P.O. Box 519

N-1612 Fredrikstad

Norway

Tel: +47 69 30 00 60

DRAWING

DRAWN BY

SFD

REVISED DATE

06.09.2018

PAGE

2 OF 2

TITLE

ESI-1 Connection Diagram

REVISION

2

DRAWN DATE

06-Sep-18

APPROVED BY

APPROVED DATE

0

Sleipner Motor AS

P.O. Box 519

N-1612 Fredrikstad

Norway

Tel: +47 69 30 00 60

DRAWING

DRAWN BY

SFD

REVISED DATE

06.09.2018

PAGE

2 OF 2

TITLE

ESI-1 Connection Diagram

REVISION

2

DRAWN DATE

06-Sep-18

APPROVED BY

APPROVED DATE

0

Sleipner Motor AS

P.O. Box 519

N-1612 Fredrikstad

Norway

Tel: +47 69 30 00 60

DRAWING

DRAWN BY

SFD

REVISED DATE

06.09.2018

PAGE

2 OF 2

TITLE

ESI-1 Connection Diagram

REVISION

2

DRAWN DATE

06-Sep-18

APPROVED BY

APPROVED DATE

0

Sleipner Motor AS

P.O. Box 519

N-1612 Fredrikstad

Norway

Tel: +47 69 30 00 60

Visual Wiring Diagram

Содержание ESI-1

Страница 1: ...ikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE To download your language go to www sleipnergroup com 2920 6 K e e p t h i s m a n u a l o n b o a r d 2021 Including Installatio...

Страница 2: ...nterface User Manual Product Features 3 4 Installation Manual Responsibility of the Installer 5 Considerations and Precautions for S Link System 5 Measurements 6 Technical Specifications 7 ESI Install...

Страница 3: ...back for hydraulic thrusters RO2 will be activated when the hydraulic thruster can run If there is active emergency feedback from the hydraulic controller PHC then RO2 will be deactivated RO2 have onl...

Страница 4: ...e ESI 1 will always send thrust with the same priority as other devices The thruster controller will output the highest thrust received and stop if signals have conflicting directions Connections ESI...

Страница 5: ...th the product before installation Instructions in this document cannot be guaranteed to comply with all international and national regulations It is the responsibility of the installer to follow all...

Страница 6: ...escription mm inch L ESI Length 190 7 48 L Additional ESI Length 212 8 35 H ESI Height 156 5 6 16 W ESI Width 58 5 2 3 W Additional ESI Width 2 8 0 11 a Distance of attachment holes width 200 7 87 b D...

Страница 7: ...C to 85 C 40 F to 176 F IP Rating IP20 Weight 500 g 1 1 lb Digital Input DI1 to DI7 with common 0V Opto isolated 8 31V Digital Output DO1 to DO6 Max 4A Dedicated supply input 8 31VDC Relay contacts N...

Страница 8: ...wire connected to 12VDC or 24VDC To reduce the risk of interference avoid routing the S Link cables close to equipment such as radio transmitters antennas or high voltage cables The backbone must be t...

Страница 9: ...PPROVED BY APPROVED DATE 0 APPROVED DATE 0 Sleipner Motor AS P O Box 519 N 1612 Fredrikstad Norway Tel 47 69 30 00 60 DRAWING DRAWN BY SFD REVISED DATE 06 09 2018 PAGE 2 OF 2 TITLE ESI 1 Connection Di...

Страница 10: ...o the Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding that fo...

Страница 11: ...11 2920 6 2021 ESI...

Страница 12: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Group cannot accept liability for any possible differences...

Отзывы: