18
3.2 5 outputs board with fuses
One or two 5 outputs boards with fuses optional can be integrated in the C85 cabinet.
The first 5 outputs board with fuses is to be connected on the load1 output of the power supply and the second
5 outputs board with fuses is to be connected in the same way on the load2 output of the power supply. The
two boards operate identically. For more information about connection of 5 outputs board with fuses optional
see the instruction sheet delivered with the board.
3.3 Maximum connection sizes
Cable section
Cable type
Mains
0.3 – 2.5 mm²
2.5 mm²
6 mm²
6 mm²
1.5 mm²
Batteries
0.3 – 6 mm²
Load (2 outputs)
0.3 – 6 mm²
Alarm reports* (unpluggable)
0.3 – 1.5 mm²
4
Commissioning
After the electrical connections are made (mains, loads and batteries).
1. Close the upstream mains circuit-breaker.
2. Check the load output voltage. The LED of power supply turns red.
3. Check that the LED confirming correct power supply operation is illuminated:
o
all OK: green,
o
mains fault: orange,
o
battery or charger fault, or load not present: red (this fault takes priority over a mains
fault).
4. Connect the ground wire and the cable ribbon (if equipped).
5. Close the cover.
Your equipment is in operation when the 2 green LEDs, corresponding to the load outputs, are
illuminated.