background image

The gas metered in 3 minutes to obtain rated input for 
each boiler model, using 1000 Btu/cu. ft. gas, is tabu-
lated in gas rate table.

B. Main Burners

1. Fire the boiler continuously for at least 15 minutes, to

reach burner operating temperature.

2. Observe the flames, all burners. The base of all flame

jets should be blue. The tips should be blue shading
to orange. NOTE: Dust, disturbed by any movement,
will cause bright orange flames. Wait for dust to settle.

3. For one burner, close the air shutter until some of its

flame jet tips turn yellow-white, indicating insufficient
primary air. Then open shutter until whitish tips disap-
pear completely. Set all burner shutters to the same
opening. Observe to make sure that no yellow-white
tips appear over any portion of the flame. Small yel-
low tips at the pilot are per mitted (see Figure 18).

NOTE: This adjustment method gives MINIMUM pri-
mary air setting for safe combustion. DO NOT attempt
to make this adjustment unless burners are at operat-
ing temperature. Adjustment should be made with
burner access panel in final operating position. Use of
a mirror may be helpful to observe flames. Note that
burner ports are on top of main burner tube.

C. Main Burner Ignition Checkout and Pilot Adjustment

1. The pilot flame must not smother or snuff out when

tested as follows:
a. Main burner ignition from cold start-repeat.
b. Continued operation of main burner.
c. Main burner ignition with appliance at maximum

operating temperature after prolonged operation.

NOTE: Observe operation of the pilot burner with
appliance doors in the final operating position. Use of
a mirror may be helpful.

2. Pilot Burner Adjustment

The pilot flame should envelope approximately 3/8 to
1/2 inch of sensor tip (see Figure 19). To adjust pilot
flame:
a. Remove the pilot adjustment cover screw from the

gas control.

b. Turn pilot adjustment screw clockwise to decrease

or counterclockwise to increase pilot flame.

c. Replace pilot adjustment cover screw.

SAFETY CHECK

Removing Control Box (cover). See Figure 20.
To remove control box:
a. Turn black screw 1/4 turn clockwise to open position        .
b. Remove two sheet metal screws in the top of control box.
c. Remove control box.
To replace the box, reverse procedure. Be sure that black
screw is in the lower bracket receptacle and lock position

.

V

ICTORY

20

Boiler rated input in

cu. ft./hr. of 1000 Btu/cu. ft.

Natural Gas

30
60
90

120
150
180

Cubic Feet Gas Consumption

1000 Btu/cu. ft. gas, in

3 minutes, at rated input

1.50
3.00
4.50
6.00
7.50
9.00

Figure 18.

Figure 19.

Gas Rate Table

Содержание victory II VH series

Страница 1: ...is boiler is under positive pres sure when it is connected to the outdoors with 3 diameter pipe Leakage from this system can be hazardous and if not avoided can result in death or ser ious injury In a...

Страница 2: ...0 3000 4000 5000 6000 7000 8000 9000 10000 Orifice Size for Sea Level Orifice Sizes for High Altitudes Includes 4 Reduction for Each 1000 Feet Elevation Feet Orifice sizes indicated for sea level abov...

Страница 3: ...fueled shall not be installed in an abo ve grade under floor space or basement unless such loca tion is provided with an approved means for removal of unburned gas Consult Chapter 5 of the 1994 UNIFOR...

Страница 4: ...ith a minimum FREE air passage area of 1 square inch per 1000 Btuh of total appliances input IF BOILERS ARE INSTALLED ADJACENT TO OTHER FUEL BURNING EQUIPMENT THE AREA OF FREE OPENINGS MUST BE APPROPR...

Страница 5: ...ght run would be 20 2 x 3 14 ft 3 Installation A Horizontal Venting Figures 5 and 6 show typical horizontal venting For combustible wall passage of vent piping a U L listed thimble must be used See Fi...

Страница 6: ...ltitudes 5500 to 7000 Ft Altitudes 7000 to 10 000 Ft Altitudes Equivalent Length of each 90 Elbow Ft Max Equivalent Length Ft VH 30 30 30 30 6 2 60 90 and 120 VH 150 30 30 15 6 2 VH 180 30 15 15 6 2 F...

Страница 7: ...VICTORY II 7 Figure 6 Figure 5 VICTORY II HORIZONTAL VENTING All joints must be liquid and pressure tight Use U L listed single wall 3 dia AL29 4C S S venting materials See page 5...

Страница 8: ...VICTORY 8 Figure 7...

Страница 9: ...VICTORY Figure 8 9...

Страница 10: ...lined masonry chimney If a masonry chimney is exposed to the outdoors on one or more sides below the roof line exposed chimney it must be re lined with a UL listed metallic liner system See Table 2 in...

Страница 11: ...height and connector 11 9 VH 180 length restrictions 2 Connector may have to be upsized to 6 diameter to meet requirement of 11 9 Additional National Fuel Gas Code Boiler Gas Appliance Reference Tabl...

Страница 12: ...VICTORY 12 Figure 9...

Страница 13: ...VICTORY Figure 10 13...

Страница 14: ...ional Fuel Gas Code ANSI Z223 1 latest edition C The boiler and its gas connection must be leak tested before placing the boiler in operation Use liquid soap solution for all gas leak testing DO NOT u...

Страница 15: ...g arrangement 1 Supply and Return For tapping sizes see dimensions on page 2 Shut off valves are recommended 2 Circulating Systems Victory II boilers are equipped with a water circulating pump mounted...

Страница 16: ...VICTORY 16...

Страница 17: ...VICTORY Figure 14 Figure 15 Piping Arrangement 17...

Страница 18: ...quipment PIPING A HEATING COOLING SYSTEM TO A WATER BOILER AND CHILLER Figure 16 illustrates a method of piping a heating cooling sys tem to a water boiler and a chiller Hand valves shown or automatic...

Страница 19: ...sired setting 10 If appliance will not operate follow the instructions To Turn Off Gas To Appliance and call your service or gas supplier To Turn Off Gas to Appliance 1 Set thermostat to lowest settin...

Страница 20: ...op of main burner tube C Main Burner Ignition Checkout and Pilot Adjustment 1 The pilot flame must not smother or snuff out when tested as follows a Main burner ignition from cold start repeat b Conti...

Страница 21: ...m meter to burner including gas valve gas piping manifold and pilot burner DO NOT use open flame CARE AND MAINTENANCE This section must be brought to the attention of the o wner by the installer so th...

Страница 22: ...ers are not firing 3 Annual Inspection and Cleaning The following must be done by a competent serviceperson to help insure safe and reliable operation A Flue passage cleaning See Figure 23 It is sugge...

Страница 23: ...LVE OPENS IGNITOR OFF BOILER HEATING PERIOD WAIT FOR AIR PROVING SWITCH TO OPEN NO NO NO PILOT AND MAIN VALVE CLOSE NO YES YES YES YES YES NO NO Victory II Boiler Sequence of Operations BOILER WATER T...

Страница 24: ...2 High limit of electronic Aquastat open nor mal condition 3 No power 4 Defective Aquastat 5 Defective transformer 6 Harnesses plug in connector is not securely connected at both ends 7 Damaged harne...

Страница 25: ...at to call heat Remove connector marked B2 B1 R on Aquastat Check terminal B2 B1 for 24V Follow Smart Valve system troubleshooting in Smart Valve Honeywell Instruction Manual to find out if Smart Valv...

Страница 26: ...nting system 4 Condensation trap is not full of water 4 Check and fill with water 5 Venting system is physically damaged 5 Check carefully and repair Also see Venting System Regular Inspection 6 Over...

Страница 27: ...Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction leakage corrosion and other deficiencies which could cause an unsafe conditi...

Страница 28: ...VICTORY SLANT FIN CORPORATION Greenvale N Y 11548 Phone 516 484 2600 FAX 516 484 5921 Canada Slant Fin LTD LTEE Mississauga Ontario www slantfin com...

Отзывы: