background image

V

ICTORY 

II 

VHS Models

10

CATEGORY 

I

VENTING (Natural Draft Chimney and

Type “B” Venting)

1. Installation

Model VHS-90, VHS-120, VHS-150 and VHS-180 may be
vented into a natural draft masonry chimney or natural
draft type“B” vent if a 3" diameter stainless steel elbow
connected to the boiler’s flue collar and the vent connec-
tor converted to 5" diameter using a 3" x 5" vent adapter.
Single or multiple appliance venting are shown in Figures
9 and 10.

2. Vent Connector Material

Vent connectors may be single wall or Type “B” made of
galvanized or stainless steel materials.

3. Venting Requirements

If the boiler vent is to be installed into a natural draft
masonry chimney or Type “B” venting, it must be in accor-
dance with National Fuel Gas Code ANSI Z223.1-latest
edition, Part 7, Part 11 and Appendix G.

For a masonry vitreous tile-lined chimney which is not
exposed to the outdoors, use Table 1 in this Slant/Fin
manual for venting requirements. DO NOT install this sys-
tem into an unlined masonry chimney.

If a masonry chimney is exposed to the outdoors on one
or more sides below the roof line (exposed chimney), it
must be re-lined with a UL listed metallic liner system.
See Table 2 in this Slant/Fin manual for venting require-
ments of metallic re-lined chimneys.

If a Type “B” vent system is used, it must NOT be exposed
to the outdoors below the roof line. See Table 2 in this
Slant/Fin manual for venting requirements. Vent connec-
tors serving appliances vented by natural draft shall NOT
be connected into any portion of mechanical draft sys-
tems operating under positive pressure.

In some cases, the vent connector diameter must be up-
sized further to 6" or 7". Refer to Table 1 and 2 for instal-
lations requiring this increased size.

If this boiler is replacing a boiler which is connected to a
common venting system with other natural draft, gas-fired
appliances, the removal of the existing boiler from the vent-
ing system is likely to cause the system to be too large for
proper venting of the appliances remaining connected to it.
At the time of removal of the existing boiler, the test proce-
dure specified in Appendix “B” must be followed.

Содержание VHS-180

Страница 1: ...is under positive pres sure when it is connected to the outdoors with 3 diameter pipe Leakage from this system can be hazardous and if not avoided can result in death or serious injury In addi tion to...

Страница 2: ...b Gas Type 2000 3000 4000 5000 6000 7000 8000 9000 10000 Orifice Size for Sea Level Orifice Sizes for High Altitudes Includes 4 Reduction for Each 1000 Feet Elevation Feet Orifice sizes indicated for...

Страница 3: ...ces so fueled shall not be installed in an above grade under floor space or basement unless such loca tion is provided with an approved means for removal of unburned gas Consult Chapter 5 of the 1994...

Страница 4: ...g with a minimum FREE air passage area of 1 square inch per 1000 Btuh of total appliances input IF BOILERS ARE INSTALLED ADJACENT TO OTHER FUEL BURNING EQUIPMENT THE AREA OF FREE OPENINGS MUST BE APPR...

Страница 5: ...mble Part Numbers and more information B Vertical Venting Figure 7 shows typical vertical venting A fire stop is required for each ceiling and floor penetration An existing chimney see Figure 8 may be...

Страница 6: ...Ft Altitudes 5500 to 7000 Ft Altitudes 7000 to 10 000 Ft Altitudes Equivalent Length of each 90 Elbow Ft Max Equivalent Length Ft VHS 30 30 30 30 6 2 60 90 and 120 VHS 150 30 30 15 6 2 VHS 180 30 15 1...

Страница 7: ...of Snow Line Knowledge of local conditions will reveal the maximum height that repeated snowfalls accumulate to The height should be used as the SNOW LINE Definition of Snow Line Knowledge of local co...

Страница 8: ...VICTORY II VHS Models 8 Figure 7...

Страница 9: ...VICTORY II VHS Models Figure 8 9...

Страница 10: ...to an unlined masonry chimney If a masonry chimney is exposed to the outdoors on one or more sides below the roof line exposed chimney it must be re lined with a UL listed metallic liner system See Ta...

Страница 11: ...ey height VHS 180 and connector length restrictions 10 9 1999 edition 2 Connector may have to be upsized to 6 diameter to meet requirement of 10 9 Additional National Fuel Gas Code Boiler Gas Applianc...

Страница 12: ...VICTORY II VHS Models 12 Figure 9...

Страница 13: ...VICTORY II VHS Models Figure 10 13...

Страница 14: ...dix C of National Fuel Gas Code ANSI Z223 1 latest edition C The boiler and its gas connection must be leak tested before placing the boiler in operation Use liquid soap solution for all gas leak test...

Страница 15: ...sizes see dimensions on page 2 Shut off valves are recommended 2 Circulating Systems Victory II boilers are equipped with a water circulating pump mounted to the return water connection on the boiler...

Страница 16: ...VICTORY II VHS Models 16...

Страница 17: ...VICTORY II VHS Models Figure 14 Figure 15 Piping Arrangement 17...

Страница 18: ...er equipment PIPING A HEATING COOLING SYSTEM TO A WATER BOILER AND CHILLER Figure 16 illustrates a method of piping a heating cooling sys tem to a water boiler and a chiller Hand valves shown or autom...

Страница 19: ...9 Set thermostat to desired setting 10 If appliance will not operate follow the instructions To Turn Off Gas To Appliance and call your service or gas supplier To Turn Off Gas to Appliance 1 Set therm...

Страница 20: ...ports are on top of main burner tube C Main Burner Ignition Checkout and Pilot Adjustment 1 The pilot flame must not smother or snuff out when tested as follows a Main burner ignition from cold start...

Страница 21: ...This section must be brought to the attention of the owner by the installer so that the owner can make the necessary arrangements with a qualified service agency for the periodic care and maintenance...

Страница 22: ...d on burners to collect any foreign material in cleaning flues 1 Remove control box see instruction under Safety Check See Figure 20 2 Remove jacket top 3 Remove inducer assembly 4 Remove flue collect...

Страница 23: ...OR CONTINUES TO RUN NATURAL GAS S8600F IGNITION SPARK CONTINUES PILOT VALVE REMAINS OPEN UNTIL SYSTEM IS RESET SPARK GENERATOR OFF MAIN VALVE OPENS MODULE MONITORS PILOT FLAME NO NO NO NO YES YES YES...

Страница 24: ...e blower motor 8 Check voltage 120V at motor connector Replace defective motor 9 Defective transformer 9 Replace Aquastat 10 Defective gas valve 10 Replace BURNERS WILL NOT SHUT OFF CAUSE REMEDY 1 Def...

Страница 25: ...nd venting system 4 Condensation trap is not full of water 4 Check and fill with water 5 Venting system is physically damaged 5 Check carefully and repair Also see Venting System Regular Inspection 6...

Страница 26: ...ystem b Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction leakage corrosion and other deficiencies which could cause an unsafe...

Страница 27: ...SLANT FIN CORPORATION Greenvale N Y 11548 Phone 516 484 2600 FAX 516 484 5921 Canada Slant Fin LTD LTEE Mississauga Ontario www slantfin com...

Отзывы: