C. Main Burner Ignition Checkout and Pilot Adjustment.

1. The pilot flame must not smother or snuff out when  tested

as follows:
a. Main burner ignition from cold start – repeat.
b. Continued operation of main burner.
c. Main burner ignition with appliance at maximum oper-

ating temperature after prolonged operation.

NOTE: Observe operation of the pilot burner with appli-
ance doors in the final operating position. Use of a mirror
may be helpful.

2. Safety Shutdown Checkout

a. For proper operation the pilot should engulf the thermo-

couple or flame sensor as shown above.

b. To adjust pilot, turn pilot flow adjustment screw on valve

clockwise  or  counterclockwise  to  give  a  steady  flame
enveloping 10 mm to 13 mm (3/8 to 1/2 inch) of the tip of
the thermocouple or flame sensor. Note that turning the
pilot  adjust  screw  clockwise  will  decrease  the  pilot
flame.

c. Check safety shutdown of gas valve by following proce-

dure outlined in "CARE and MAINTENANCE" section.

WARNING: THE FLOW OF COMBUSTION AND VENTILATING
AIR TO THE BOILER SHOULD NOT BE OBSTRUCTED.
This section must be brought to the attention of the owner by
the  installer  so  that  the  owner  can  make  the  necessary

arrangements with a qualified service agency for the periodic
care and maintenance of this boiler. The installer must inform
the owner that the gas supplier can recommend a number of
qualified service agencies. The installer must also inform the
owner  that  the  lack  of  proper  care  and  maintenance  of  this
boiler  and  any  fuel  burning  equipment  may  result  in  a  haz-
ardous condition.

1. GENERAL  MAINTENANCE (Refer  also  to  Owner’s

Information Manual)
These  operations  are  recommended  to  be  performed  at
regu lar intervals:
A. BOILER  HEATING  SURFACES:  clean  off  all  coatings

found.

B. BOILER  CONTROLS:  check  contacts,  settings,  correct

functioning.

C. PIPING: check piping and accessories for leaks.
D. CHIMNEY  VENTING  SYSTEM:  check  for  obstructions

and leaks. 

E. BOILER ROOM AIR SUPPLY: check air supply openings

for  continued  POSITIVE  supply  of  air  as  required.  Air
needs  are  greatest  in  cold  weather.  Air  vents  must  be
open and free of obstruction.

F. WATER SYSTEM CHECK:

1. System to be full of water, and pressure to remain sta-

ble at correct setting on gauge.

2. Air  control  system:  noise  and  air  binding  in  system

should be corrected.

3. Water lines: slightest leaks should be corrected.
4. Low  water  cutoff,  for  operation  (see  instructions  fur-

nished with unit).

2.  WATER LEVEL CHECK DURING HEATING SEASON

A. Check water pressure regularly and add water slowly to

system  when  needed.  If  much  water  is  added,  venting
may be necessary.

B. Regular loss of water from water boiler system may indi-

cate either a system leak, or a faulty air control system,
or a faulty automatic fill valve, or a faulty relief valve.

3. ANNUAL INSPECTION AND CLEANING

A. It is important that this boiler be inspected by a compe-

tent serviceperson to help insure safe and reliable oper-
ation.

B. Check for gas leaks from valve and gas piping to burn-

ers  and  pilot.  If  leaks  are  found,  repair  or  replace  as
required.

C. This inspection should include:

1. Controls check. See "Safety Check for Control 

System" (Section 4) below. 

2. Recheck of input gas rate to burners. See "Initial Start"

paragraph in "Operating instructions" section.

3. Re-adjusting  for  best  flame  characteristics  of  main

flame and pilot(s).
See  "Initial  Start"  paragraph  in  "Operating  Instruc -
tions" section and see "Burner Adjustment" section.

4. Burner and boiler flue passage cleanliness:

BURNER AND FLUE CLEANING (see figure 15). It is
suggested that paper be placed on burners to collect

any foreign material when cleaning flues.
a. Remove jacket top and flue cover. 
b. Use wire brush to clean flueways.
c. Replace  flue  cover  and  re-seal  with  furnace

cement. Replace jacket top. Remove and dispose
of paper and accumulated material.

d. If burner surfaces are not clean, or if uneven flame

indicates plugged burner ports, remove and clean
burners.

NOTE-TO REMOVE BURNERS:

1. Disconnect pilot at pilot mount, or disconnect pilot gas

line at gas valve, before removing burners next to pilot.

2. Remove burner mounting clip.
3. Lift burner and remove burner from orifice.
4. Clean and replace burners* and pilot. Adjust burners as

described on page 16.

*To clean burners run a clean flue brush up the tube until all foreign mat-

ter is removed.

4. SAFETY CHECK FOR CONTROL SYSTEM

A. High  limit  control  test:  Set  thermostat  high  enough  for

boiler water temperature to reach high limit control set-
ting.  When  this  temperature  is  reached,  the  high  limit
switch  should  open,  and  the  main  gas  valve  should

16

Sentinel

Figure 13.

Figure 14.

CARE AND MAINTENANCE

10–13 mm (3/8 – 1/2")

Содержание SENTINEL

Страница 1: ... READING THE INSTALLATION INSTRUCTIONS The installation must conform to the requirements of the authority having jurisdiction or in the absence of such requirements to the National Fuel Gas Code ANSI Z2231 latest edition or CSA B 149 1 latest edition for natural gas and propane The installation must also conform to the additional requirements in this Slant Fin Instruction Book In addition where re...

Страница 2: ...ther appliance are vented to a single chimney Orifice indicated for sea level above are factory installed in boiler unless otherwise specified by the local authority See Section III on page 15 for burner input adjustment 1 1 2 FPT Supply 419 mm 16 1 2 552 mm 21 3 4 3 4 to air eliminating system by others Vent Damper shown vertically Vent Damper shown horizontally Sediment Trap required High Limit ...

Страница 3: ... etc during appliance operation and service circulator replace ment condensate trap control replacement etc BOILER FOUNDATION A Provide a solid level foundation capable of supporting the weight of the boiler filled with water and extending at least 51 mm 2 past the jacket on all sides See dimensions of boiler page 2 B For installation on non combustible floors only The Com bustible Floor Kit part ...

Страница 4: ...s utility local building codes and other authorities having jurisdiction If a masonry chimney is exposed to the outdoors on one or more sides below the roof line exterior chimney ONE of the following options apply 1 Chimney must be re lined with an approved metallic liner When this is done the chimney will be considered NOT exposed to the outdoors and the requirements for NON exposed chimneys and ...

Страница 5: ...od outlet and the connec tor to the outdoor chimney or vent as close to the draft hood as practicable and without modification of the draft hood or the damper See figures 1 and 2 6 The inlet size of the vent damper must be the same nominal trade size as the outlet of the draft hood 7 This device must be located in a venting system or section of a venting system so that it serves only the single ap...

Страница 6: ...ther end of the flexible metal conduit has a small molex plug and a 90 degree metal conduit connector Route the molex receptacle through the conduit bracket on the vent damper Place the harness receptacle into the damper plug Securely fasten the harness conduit con nector to the conduit bracket by carefully pushing it into the hole in the bracket 4 Restore electrical power and turn on gas supply C...

Страница 7: ...electrical source is utilized the boiler when installed must be electrically grounded in accordance with the requirements of the authority having jurisdiction or in absence of such requirements with the Cana dian Electric Code CSA C22 1 Part 1 latest edition C Basic control wiring diagrams are supplied Other control systems may be factory sup plied see User s Information Manual and Instructions pa...

Страница 8: ...8 Sentinel Figure 8 Multizoning of Sentinel boilers pump zoning system using R845A relay Figure 9 Multizoning of Sentinel boiler 2 zone system pump zoning system using R882A B relays ...

Страница 9: ... same function THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITONS IS TRUE r e t a w r e l i o b e h t s e c u d e r t a h t d e l l a t s n i s i m e t s y s t n e m e g a n a m y g r e n e l a n r e t x e n A temperature as the heating load decreases g n i t a e h e c a p s y n a r o f d e s u t o n s i r e l i o b s i h T r e t a e r g r o H B M 0 0 3 w k 8 8 f o t u p...

Страница 10: ...AIN BURNERS OFF VENT DAMPER CLOSES CIRCULATOR OFF SYSTEM GOES TO STANDBY SPARK GENERATOR MODULE POWERED S8600F OR S8600M IGNITION SPARK STARTS AND PILOT VALVE OPERATOR OPENS S8670E IGNITION SPARK AND PILOT VALVE OPERATOR DELAYED FOR 30 70 SECONDS L P PROPANE GAS S8600M and S8670E IGNITION TRIAL CONTINUES FOR 90 SECONDS AFTER TRIAL FOR IGNITION SYSTEM SHUTS OFF AFTER 5 MINUTES MODULE RE INSTATES TR...

Страница 11: ... push and hold the but ton a second time for 20 seconds The display will read Pur OFF SETTING THE CONTROL At initial start up with the Economy Feature active the control establishes a 63 C 145 F target temperature To test the high limit shut off function the Economy Dial must be turned to OFF Once tested restore the Economy setting If the heating demand is high the target will increase over time t...

Страница 12: ...l Targeting Works on page 4 for more information zECONOMY TARGET When the Economy feature is active the Fuel Smart HydroStat continually sets target temperatures below the high limit setting to maximize fuel efficiency When the boiler water reaches the target temperature the LED illuminates and the burner will shut down The boiler water will continue to cir culate and heat the house as long as the...

Страница 13: ...nd should be provided If the boiler is not near an outside wall air may be ducted to it from outside wall openings Provisions for combustion and ventilation air must be made in accordance with section 5 3 Air for Combustion and Ventila tion of the National Fuel Gas Code ANSI Z2231 latest edition or CSA B 149 1 latest edition for natural gas and propane or applicable provisions of the local buildin...

Страница 14: ...ER PIPING I CIRCULATING SYSTEMS A Hot water heating systems include a water circulating pump which may be mounted on the supply or return side of the boiler based on system design See figure 5 II AIR CONTROL SYSTEM A DIAPHRAGM EXPANSION TANKS are used to control system pressure in an AIR ELIMINATING SYSTEM an automatic air vent is used to REMOVE air from the sys tem water See figure 9 If system pr...

Страница 15: ...NSI Z223 1 latest edition or CSA B149 1 00 for natural gas and propane does NOT permit firing at a higher input rate than the input rate indicated on the boiler rating plate in order to avoid hazardous conditions such as explosion or carbon monoxide poisoning b Poor higher heating value of gas is causing the actual input to be substantially lower than the rating plate indication Higher heating val...

Страница 16: ... gauge 2 Air control system noise and air binding in system should be corrected 3 Water lines slightest leaks should be corrected 4 Low water cutoff for operation see instructions fur nished with unit 2 WATER LEVEL CHECK DURING HEATING SEASON A Check water pressure regularly and add water slowly to system when needed If much water is added venting may be necessary B Regular loss of water from wate...

Страница 17: ...hen system water glycol solution is in contact with a potable water vessel as with a tankless heater PROPYLENE GLYCOL is used in the quick freeze food industry it is practically non toxic Its use may be permitted when tankless heaters are used When anti freeze must be used inhibited propylene glycol is recommended Useful information on the characteristics mixing proportions etc of glycol in heatin...

Страница 18: ...zontal run of smokepipe 4 Inadequate chimney or venting system REMEDY 1 Check clean re light See instructions 2 Open gas valve s 3 Close switch 4 Replace fuse 5 Check control Clean contacts or replace control 6 Repair or replace 7 Replace transformer 8 Check clean and reinstall 9 Check with test light and correct 10 Check and correct in accordance with wiring diagrams included with appliance instr...

Страница 19: ...t so appliance will operate continuously e Test for spillage at the draft hood relief opening after 5 min utes of main burner operation Use the flame of a match or candle or smoke from a cigarette cigar or pipe f After it has been determined that each appliance remain ing connected to the common venting system properly vents when tested as outlined above return doors win dows exhaust fans fireplac...

Страница 20: ...ed from a well This accumulation creates an insulating layer that drastically affects boiler efficiency by reducing the transmission of heat through this primary transfer surface and causes extreme metal temperatures that eventually crack the heat exchanger RECOMMENDATIONS On all installations in hard water areas 1 The system should be thoroughly inspected for leaks which must be repaired however ...