background image

EUTECTIC EC-10 DV

5

If system pressure needs further control, add an additional tank or install a 
larger capacity tank. The automatic air vent should be installed in the top of 
the boiler, as in figure 3.

B. CONVENTIONAL COMPRESSION TANKS (non-diaphragm type) are 

used to control system pressure in an AIR COLLECTING SYSTEM. Within 
the system, after initial start-up and venting, air is collected in the tank and 
acts in contact with the water to control pressure. Air is not vented from this 
system. If system pressure needs further control, add another tank in
parallel with the original tank or install a large capacity tank. Locate the 
tank at the inlet end of the pump near the boiler. (See figure 3)

C. HOT WATER RADIATION VENTING - Manual air vents should be installed 

at the top of all "drops" (where piping goes downward). Air must be vented 
or purged from all zone lines to permit proper system heating.

D. PUMP LOCATION - Locating low-head pump(s) on return to boiler is 

acceptable for smaller boiler sizes in residences of one or two stories.
The pump location shown in figure 3 is required in large, multi-story
building installations, especially when high-head pumps are used.

IMPORTANT:

Hot water heating systems containing high water volume, such

as would occur with cast iron radiation, require special care with air elimina-
tion. The circulator pump should be located on the boiler supply pipe and the
expansion tank and air scoop should be located near the pump suction.

INSTALLING THE BURNER

See Burner Data, pages 12-13, and Burner Manual supplied with burner. If
burner is not mounted as received, mount to boiler, placing flange over
mounting studs. Use gasket between flange and boiler. Distance between
flange and nose of burner must be as shown in table on page 12 (Burner
Insertion Depth). Check to see that nozzle and settings are as given in burner
data tables, pages 12-13.

3

8

 –

0.430

0.0075

1

2

40

0.622

0.0157

0.545

0.0121

5

8

 –

0.666

0.0181

3

4

40

0.824

0.0277

0.785

0.0251

1

40

1.049

0.0449

1.025

0.0429

1

1

4

40

1.380

0.0779

1.265

0.0653

1

1

2

40

1.610

0.106

1.505

0.0924

2

40

2.067

0.174

1.985

0.161

2

1

2

40

2.469

0.249

2.465

0.248

3

40

3.068

0.384

2.945

0.354

Nominal

pipe Dia.

Pipe

Schedule

Pipe ID

Inch

Gal. per

Lin.Ft.

Pipe ID

Inch

Gal. per

Lin. Ft.

Standard Steel Pipe

Copper Pipe

VOLUME OF WATER IN STANDARD PIPE OR TUBE

13-31/32

7-11/16

Relief valve 3/4

1/2” NPT Tapping
for Feed Valve and
Expansion Tank

1-1/4 NPT
return tapping

Drain outlet

Panel Mounted

Tridicator Temperature

Sensor Well

Air Eliminator
as per Manufacturer
Specifications

To Circ. (s)
and Zones

1-1/4”

NPT

Supply

Automatic
Air Vent

Suppy Pipe Mounted

Tridicator

Panel Mounted
Tridicator Pressure
Sensor Well

Figure 3.

Air Eliminating System or Alternating Collecting System. Pipe off to a safe place the relief valve and drain outlet.

EC-13      EC-14 

EC-15      EC-16

5

6.5

8

8.5

WATER CONTENT OF BOILER (GALLONS)

BURNER INSERTION DEPTH

Содержание EUTECTIC EC-10DV Series

Страница 1: ...ditional requirements in this Slant Fin Instruction Manual Where there is any differ ence the more stringent requirement shall govern In addition where required by the authority having jurisdiction th...

Страница 2: ...usted to produce 13 CO2 All dimensions subject to normal manufacturing tolerance NOTE All boilers under 300 000 Btuh 87 9 kw input are tested and rated for capacity under the U S Department of Energy...

Страница 3: ...anticipated snow line The terminal shall be positioned so that flue gases are not directed where they can jeopardize people overheat combustible structures or enter buildings Vent terminal should be...

Страница 4: ...system causes the introduction of a frequent supply of fresh water into the boiler This will cause damage to the boiler Use of heat exchangers will prevent this damage PIPING FOR WATER UNITS NOTE On...

Страница 5: ...ld be located on the boiler supply pipe and the expansion tank and air scoop should be located near the pump suction INSTALLING THE BURNER See Burner Data pages 12 13 and Burner Manual supplied with b...

Страница 6: ...nt terminal and air supply pipe are properly installed and clear of obstruction Note Neither overfire nor flue draft should exceed 0 35 WC during burner operation THE FLUE IS UNDER POSITIVE PRESSURE D...

Страница 7: ...EUTECTIC EC 10 DV 7 Aquastat Control and Honeywell R7184P Primary Single Zone Wiring for Beckett Carlin Burners Only...

Страница 8: ...8 EUTECTIC EC 10 DV...

Страница 9: ...EUTECTIC EC 10 DV 9...

Страница 10: ...EUTECTIC EC 10 DV 10 Honeywell L7248L Beckett 7600A and HydroLevel 3250 Controls See Adjusting Settings error codes for L7248L on page 11...

Страница 11: ...rting to default settings or has stopped running the Outdoor Reset algorithms The warnings are cleared when the issue s is resolved b To clear Err 8 condition depress and hold all three user keys simu...

Страница 12: ...lectrode Setting Turbulator location Picture 1 TURBULATOR SETTING 1 Loosen nut 1 then turn the screw 2 until the index marker 3 is aligned with the correct index number 2 Retighten the retaining nut 1...

Страница 13: ...r to increase combustion air turn the screw clockwise indicator to decrease combustion air 3 The final position of the air damper will vary on each installation Use instruments to establish the proper...

Страница 14: ...roper burner operation ONLY THE NOZZLES SPECIFIED IN THIS MANUAL OR ON THE BURNER LABEL SHOULD BE USED FOR REPLACEMENT A flue brush triangular shape is supplied with boiler 7 Protect all of the firesi...

Страница 15: ...___________________________ Model _____________________________ Serial _____________________________ SLANT FIN CORPORATION Greenvale N Y 11548 Phone 516 484 2600 FAX 516 484 5921 Canada Slant Fin LTD...

Отзывы: